Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15321-15330 of 17310 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
2026Project ID: 2026
DEA: 04228594
EFIS: 0400000655
COOP: 2055A1
04-CC-4-37.9/41.3Highway And 1 Bridge To Be Widened And 4 Bridges To Be Constructed.CONTRA COSTA COUNTY IN PITTSBURG AND ANTIOCH FROM 0.9 KM WEST OF LOVERIDGE ROAD OVERCROSSING TO 0.3 KM WEST OF SOMERSVILLE ROAD UNDERCROSSING02/06/20151 (03/30/2011)Details CEM-3701 Report
2025Project ID: 2025
DEA: 04228584
EFIS: 0400000654
04-CC-4-24.1LOVER RIDGE ROAD PUMPING PLANT 05/07/2019NOT VERIFIEDDetails CEM-3701 Report
2024Project ID: 2024
DEA: 04228554
04-CC-680- 2.9CONSTRUCT AUXILIARY LANESIN CONTRA COSTA COUNTY IN SAN RAMON AND DANVILLE AT VARIOUS LOCATIONS04/20/20111 (04/20/2011)Details CEM-3701 Report
2023Project ID: 2023
DEA: 04228444
04-CC-680-RMODIFY INTERCHANGEIN CONTRA COSTA AND ALAMEDA COUNTIES IN SAN RAMON AND DUBLINFROM 0.6 KM SOUTH TO 0.7 KM NORTH OF ALCOSTA BOULEVARD OVERCROSSING04/20/20111 (04/20/2011)Details CEM-3701 Report
2022Project ID: 2022
DEA: 042281V4
04---  05/07/2019NOT VERIFIEDDetails CEM-3701 Report
2021Project ID: 2021
DEA: 042261V4
04-MRN-101,580-15.5/17.8,7.4/7.7RTE 101/580 SAN RAFAEL INTERCHANGE IMPROVEMENTSMARIN COUNTY IN SAN RAFAEL ON ROUTE 101 FROM 0.3 KM SOUTH OF ROUTE 101/580 SEPARATION TO 0.1 KM NORTH OF SAN RAFAEL VIADUCT AND ON ROUTE 580 FROM BELLAM BOULEVARD TO ROUTE 101/580 SEPARATION04/18/2011NOT VERIFIEDDetails CEM-3701 Report
2020Project ID: 2020
DEA: 04226144
04-MRN-101-17.6/20.6WIDEN FREEWAY 09/26/2011NOT VERIFIEDDetails CEM-3701 Report
2019Project ID: 2019
DEA: 04219934
EFIS: 0400000636
04-SON-101-31.2/31.50406-6DP-1216 (Contractor's permit number); 0406-NMC-0350 (original permit issued to the town of Windsor) 0406-NRD-1253 (a rider reflecting some District directed change)WINDSOR-ARATA LANE INTERCHANGE PROJECT PHASE 2A06/08/20201 (05/11/2007)Details CEM-3701 Report
2018Project ID: 2018
DEA: 04219864
04-SON-12-027.3/035.2ROADWAY OVERLAY, SHOULDER WIDENING OPERATIONAL IMPROVEMENT, ROADWAY 07/29/20111 (07/29/2011)Details CEM-3701 Report
2017Project ID: 2017
DEA: 04209914
EFIS: 0400000630
04-SON-128-R27.8, R34.7/R35.4Bridge ReplacementSONOMA COUNTY AT AND NEAR KELLOG AT MAACAMA CREEK BRIDGEAND FROM 0.3 KM WEST TO 0.4 KM EAST OF REDWOOD CREEK BRIDGE06/08/20201 (05/23/2006)Details CEM-3701 Report