Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15291-15300 of 17601 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
2351 | Project ID: 2351 DEA: 044A2004 | 04-SON-121-9.8/11.6 | HOT MIX AND REPLACE AC SURFACING | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report | |
2350 | Project ID: 2350 DEA: 044A1904 | 04-ALA-13-10.0/11.6 | REMOVE AND REPLACE ASPHALT CONCRETE SURFACING | 05/05/2011 | 1 (05/05/2011) | Details CEM-3701 Report | |
2349 | Project ID: 2349 DEA: 044A1704 | 04-SON-128-0.0/3.3 | Remove and replace existing culverts. | SONOMA COUNTY NEAR CLOVERDALE AT VARIOUS LOCATIONS FROM THE MENDOCINO COUNTY LINE TO 1.5 MILES WEST OF CLOVERDALE BOULEVARD | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
2348 | Project ID: 2348 DEA: 044A1404 | 04-MRN-580,101-3.8/4.8,10.8 | Replace Bridge, Widen Roadway, And Construct Retaining Walls. | In Marin County in San Rafael on route 580 from 0.7 mile east of Bellam Blvd. to route 580/101 separation and on route 101 at 0.8 mile west of route 580/101 separation. | 05/05/2011 | 1 (05/05/2011) | Details CEM-3701 Report |
2347 | Project ID: 2347 DEA: 044A07U4 EFIS: 0400020643 COOP: 042443 | 04-ALA-580-R4.7/R8.2 | CONST TRUCK CLIMBING LANE, RET. WALLS, AND REHAB TRAVELED WAY. | ALAMEDA COUNTY IN AND NEAR LIVERMORE FROM 1.0 MILE EAST OF NORTH FLYNN ROAD TO GREENVILLE ROAD UNDERCROSSING | 01/03/2018 | 1 (07/31/2012) | Details CEM-3701 Report |
2346 | Project ID: 2346 DEA: 044876A4 EFIS: 0400001100 | 04-SCL-101-39.8/40.6 | REPLACEMENT HIGHWAY PLANTING | SANTA CLARA COUNTY IN SAN JOSE FROM 0.1 MILE EAST OF GUADALUPE PARKWAY TO 0.1 MILE EAST OF DE LA CRUZ BOULEVARD OVERCROSSING | 10/21/2014 | 1 (05/03/2011) | Details CEM-3701 Report |
2345 | Project ID: 2345 DEA: 04470804 | 04-ALA-205,580-2.5/15.2 | CONST. A 7-SPAN CIP P/S CONC. BOX GIRDER BRIDGE APPROX. 373 M IN LENGTH AND 12.6 M IN WIDTH. CONST. L/R MSE WALLS AT THE APPR. TO THE 580/205 SEP. WIDEN A 3-SPAN EXIST. BRIDGE WITH A REINF. CONCRETE SLAB APPROX. 31.3 M IN LENGTH AND VARYING WIDTH. | RTE 580 NEAR TRACY TO 1.8 KM WEST OF GRANT ILINE RD. UNDERCROSSING ON RTE 205 FROM MIDWAY RD. UNDERCROSSING TO CALIFORNIA AQUEDUCT BR | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
2344 | Project ID: 2344 DEA: 04470604 | 04-ALA,SJ-205,580-24.5/24.7,0.0/4.0 | HIGHWAY IMPROVEMENTS ON RTE 580 & 205 | 04/19/2021 | 1 (02/13/2007) | Details CEM-3701 Report | |
2343 | Project ID: 2343 DEA: 04465504 MINOR: 04A2822 | 04-SCL-280-12.0/13. | REMOVE TREES AND SHRUBS | 03/23/2020 | 2 (08/22/2019) | Details CEM-3701 Report | |
2342 | Project ID: 2342 DEA: 04449604 | 04-SOL-80-R9.8 | STABILIIZE LANDSLIDE | IN SOLANO COUNTY IN AND NEARFAIRFIELD AT 0.3 KM EAST OF LYNCH ROAD UNDERCROSSING | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |