Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15271-15280 of 17779 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
213239Project ID: 213239
DEA: 11257164
11-SD-15,76-R46.2/R46.8R12.1/R17.1ESTABLISH EXISTING PLANTING AND EROSION CONTROL, AND HYDROSEEDING.SAN DIEGO COUNTY NEAR BONSALL AND FALLBROOK ON ROUTE 15 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF THE ROUTE 76/15 SEPARATION AND ON ROUTE 76 FROM 0.4 MILE WEST OF SOUTH MISSION ROAD TO 0.5 MILE EAST OF ROUTE 76/15 SEPARATION09/12/20231 (06/16/2020)Details CEM-3701 Report
7415Project ID: 7415
DEA: 11257144
EFIS: 1100020469
11-SD-15,76-R46.1/R47.3,R16.7/R17.7MODIFY AND WIDEN INTERCHANGE.SAN DIEGO COUNTY NEAR BONSALL AND FALLBROOK ON ROUTE 15 FROM 0.4 MILE SOUTH TO 0.8 MILE NORTH OF ROUTE 76/15 SEPARATION AND ON ROUTE 76 FROM 0.5 MILE WEST TO 0.5 MILE EAST OF ROUTE 76/15 SEPARATION08/22/20181 (09/11/2012)Details CEM-3701 Report
210014Project ID: 210014
DEA: 11407004
EFIS: 1100020392
11-SD-105,170-R61.2/R77.8COLD PLANE, RHMA OVERLAY, AND REPLACE APPROACH SLABS.SAN DIEGO COUNTY NEAR BOULEVARD AND JACUMBA FROM 0.1 MILE EAST OF CRESTWOOD ROAD UNDERCROSSING TO THE IMPERIAL COUNTY LINE09/07/20181 (04/08/2015)Details CEM-3701 Report
994616Project ID: 994616
DEA: 112N1654
EFIS: 1122000152
11-SD-8-R61.0/R68.0PLACE RHMA-G(BWC) OVERLAY, PAVEMENT MARKING, & RUMBLE STRIP.SAN DIEGO COUNTY NEAR BOULEVARD FROM 0.1 MILE WEST OF CRESTWOOD ROAD UNDERCROSSING TO 0.2 MILE EAST OF MCCAIN VALLEY ROAD UNDERCROSSING06/11/20241 (07/18/2023)Details CEM-3701 Report
211971Project ID: 211971
DEA: 11409004
EFIS: 1112000042
11-SD-94-46.9,R58.9UPGRADE BRIDGE RAILS AND GUARDRAILS.SAN DIEGO COUNTY NEAR CAMPO AT CAMPO CREEK BRIDGE (57-0118) AND AT CAMPO CREEK BRIDGE (57-0686)08/16/20211 (06/05/2017)Details CEM-3701 Report
7132Project ID: 7132
DEA: 112M2004
EFIS: 1100020098
11-SD-79-L0.3/10.0COLD PLANE AND RHMA-G OVERLAY, REPLACE CONCRETE PAVEMENT.SAN DIEGO COUNTY NEAR DESCANSO FROM 0.3 MILE NORTH OF ROUTE 8/79 SEPARATION TO 0.7 MILE NORTH OF PASO PICACHO CAMPGROUND12/05/20121 (06/21/2012)Details CEM-3701 Report
213124Project ID: 213124
DEA: 112N0184
EFIS: 1117000166
11-SD-79-L0.0/20.2APPLY BONDED WEARING COURSE OVERLAY, SHOULDER BACKING AND COLD PLANE.SAN DIEGO COUNTY NEAR DESCANSO FROM ROUTE 8/79 SEPARATION TO EAST JUNCTION ROUTE 79/78 NEAR JULIAN04/09/20191 (07/30/2018)Details CEM-3701 Report
215360Project ID: 215360
DEA: 112N0454
EFIS: 1118000198
11-SD-94-30.0/39.0PLACING CHIP SEAL, SLURRY SEAL, SHOULDER BACKING AND STRIPING.SAN DIEGO COUNTY NEAR DULZURA AND BARRETT JUNCTION FROM 0.9 MILE EAST OF GRANDE CREEK BRIDGE TO ROUTE 188.08/02/20221 (02/08/2021)Details CEM-3701 Report
213573Project ID: 213573
DEA: 11416604
EFIS: 1113000090
11-SD-94-29.4/29.7REALIGN ROADWAY, HMA PAVING, HFST, DRAINAGE WORKSAN DIEGO COUNTY NEAR DULZURA FROM 0.3 MILE EAST OF GRANDE CREEK BRIDGE TO 0.1 MILE WEST OF MARRON VALLEY ROAD08/24/20211 (03/01/2019)Details CEM-3701 Report
208703Project ID: 208703
DEA: 112M4104
EFIS: 1100020405
11-SD-94,188-30.0/39.0,0.2/1.9PLACE SLURRY SEAL, COLD PLANE AND HMA OVERLAY.SAN DIEGO COUNTY NEAR DULZURA ON ROUTE 94 FROM 0.9 MILE EAST OF GRANDE CREEK BRIDGE TO ROUTE 188 AND ON ROUTE 188 FROM 0.2 MILE NORTH OF MEXICO BORDER TO ROUTE 9411/27/2013NOT VERIFIEDDetails CEM-3701 Report