Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15081-15090 of 17778 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
6529Project ID: 6529
DEA: 120F7424
12-ORA-1-18.4ROADWAY LIGHTING AND TRAFFIC SIGNALIN ORANGE COUNTY IN NEWPORT BEACH FROM DOVER DRIVE TO 0.1 KM SOUTHOF ROUTE 1 AND 55 SEPARATION07/28/20101 (07/28/2010)Details CEM-3701 Report
2018Project ID: 2018
DEA: 04219864
04-SON-12-027.3/035.2ROADWAY OVERLAY, SHOULDER WIDENING OPERATIONAL IMPROVEMENT, ROADWAY 07/29/20111 (07/29/2011)Details CEM-3701 Report
213475Project ID: 213475
DEA: 010C7104
EFIS: 0113000031
01-HUM-101-77.0/77.5ROADWAY PAVING AND INSTALLATION OF SIGNAL, RETAINING WALL, SIDEWALK.HUMBOLDT COUNTY IN EUREKA FROM 0.3 MILE SOUTH TO 0.2 MILE NORTH OF WABASH AVENUE04/12/20211 (08/24/2018)Details CEM-3701 Report
428Project ID: 428
DEA: 021C2304
02-LAS-395-131ROADWAY REALIGNMENTIN LASSEN COUNTY NEAR MADELINE FROM 2.9 KM NORTH TO 6.1 KM NORTH OF ASH VALLEY ROAD03/11/20111 (03/02/2007)Details CEM-3701 Report
209040Project ID: 209040
DEA: 042A2504
EFIS: 0400000813
04-SCL-152-0.1/5.2ROADWAY REALIGNMENT AND CONSTRUCT RETAINING WALLSSANTA CLARA COUNTY NEAR GILROY AT VARIOUS LOCATIONS FROM 0.2 MILE NORTH OF BELLA VISTA LANE TO 0.2 MILE EAST OF WATSONVILLE ROAD04/14/20211 (10/11/2013)Details CEM-3701 Report
212245Project ID: 212245
DEA: 024F8604
EFIS: 0213000043
02-TRI-36-26.7/27.1ROADWAY REALIGNMENT AND NEW BRIDGE CONSTRUCTIONTRINITY COUNTY ABOUT 9 MILES EAST OF FOREST GLEN FROM 0.6 MILE WEST TO 0.1 MILE WEST OF ROUTE 305/23/20221 (03/21/2017)Details CEM-3701 Report
209393Project ID: 209393
DEA: 081F0404
EFIS: 0814000150
08-SBD-395-38.3,42.7Roadway reconfigurations and repair damaged existing Type A asphalt concrete dikeFrom 1.8 mi north of Kramer Hills to 3.3 mi south of junction 395/58 in County of San Bernardino11/25/20141 (08/28/2023)Details CEM-3701 Report
210091Project ID: 210091
DEA: 010E9004
EFIS: 0115000044
01-MEN-101-36.0/38.9Roadway Reconstruction and Drainage/Slope RepairNear Willits from 0.5/3.4 mile south of Ridgewood Ranch Road04/27/20181 (12/19/2014)Details CEM-3701 Report
989Project ID: 989
DEA: 032C8604
EFIS: 0300000310
03-PLA,NEV-80-56.1/66.3Roadway Reconstruction With Pcc Pavement And Hma Overlay. 01/30/20151 (09/04/2012)Details CEM-3701 Report
213959Project ID: 213959
DEA: 100T9104
EFIS: 1000000306
COOP: 10345,10446
10-STA-99-R4.1/F4.9Roadway reconstruction, including roadway and ramp widening and new traffic signals. The work also include retaining walls, ground anchor walls, detention basins, HMA paving, storm drain, and drainage basins. First day: 4/29/19, Completion: 6/2/20State Highway 99 in Stanislaus County In the City of Turlock from 0.4 mile south to 0.4 mile north of Fulkerth Road Undercrossing.07/23/20212 (02/21/2019)Details CEM-3701 Report