Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15081-15090 of 17618 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
210402Project ID: 210402
DEA: 112T0414
11-SD-88,12-26.8/27.3INSTALL HIGHWAY PLANTING, EROSION CONTROL AND IRRIGATION SYSTEMS.SAN DIEGO COUNTY IN SAN DIEGO FROM CARROLL CANYON ROAD BRIDGE TO 0.2 MILE NORTH OF MIRA MESA BOULEVARD UNDERCROSSING05/10/20191 (06/21/2016)Details CEM-3701 Report
6992Project ID: 6992
DEA: 112T0954
EFIS: 1100000454
11-SD-15-M15.0/M16.4CONSTRUCT DIRECT ACCESS RAMPS TO I-15 MANAGED LANES AND TRANSIT STA.SAN DIEGO COUNTY IN SAN DIEGO FROM CARROLL CANYON ROAD OVERCROSSING TO 0.5 MILE NORTH OF MIRA MESA BOULEVARD UNDERCROSSING03/14/20161 (07/25/2012)Details CEM-3701 Report
994947Project ID: 994947
DEA: 112T3644
EFIS: 1121000108
11-SD-56-0.3/3.0CONSTRUCT JPCP, HMA, RHMA-G, SIGNS, BARRIERS, LANDSCAPE, & ELECTRICAL.SAN DIEGO COUNTY IN SAN DIEGO FROM EL CAMINO REAL UNDERCROSSING TO 0.3 MILE WEST OF CARMEL VALLEY ROAD OVERCROSSING 1 (01/22/2024)Details CEM-3701 Report
8154Project ID: 8154
DEA: 11403704
EFIS: 1100000785
11-SD-163-5.8/6.4,8.5/8.8PLACE OUTER SEPARATION BARRIER AND HIGH SURFACE FRICTION TREATMENT.SAN DIEGO COUNTY IN SAN DIEGO FROM GENESEE AVENUE UNDERCROSSING TO MESA COLLEGE DRIVE OVERCROSSING AND FROM 0.5 MILE NORTH OF BALBOA AVENUE OVERCROSSING TO CLAIREMONT MESA BOULEVARD OVERCROSSING08/01/20181 (12/10/2012)Details CEM-3701 Report
213368Project ID: 213368
DEA: 11419904
EFIS: 1115000038
11-SD-805-27.1/28.9GRIND PCC PAVEMENT, COLD PLANE, RHMA OVERLAY, AND SLAB REPLACEMENT.SAN DIEGO COUNTY IN SAN DIEGO FROM MIRA MESA BLVD UC TO 0.4 MILE NORTH OF ROUTE 5/805 SEPARATION02/19/20201 (09/14/2018)Details CEM-3701 Report
208903Project ID: 208903
DEA: 11404304
EFIS: 1100020014
11-SD-4,99-R23.9/R25.5CONSTRUCT OUTER SEPARATION BARRIER, WIDEN SHOULDER, MODIFY DRAINAGE.SAN DIEGO COUNTY IN SAN DIEGO FROM MISSION BAY DRIVE OVERCROSSING TO 0.5 MILE SOUTH OF LA JOLLA PARKWAY VIADUCT06/02/20151 (10/30/2013)Details CEM-3701 Report
6181Project ID: 6181
DEA: 11284604
11-SD-5-R23.9/R28.2UPGRADE MEDIAN GUARDRAIL TO CONCRETE BARRIER.SAN DIEGO COUNTY IN SAN DIEGO FROM MISSION BAY DRIVE OVERCROSSING TO NOBEL DRIVE OVERCROSSING05/04/20121 (05/08/2012)Details CEM-3701 Report
211856Project ID: 211856
DEA: 11408604
EFIS: 1112000016
11-SD-8-T0.5/R0.7COLD PLANE AND OVERLAY WITH RHMA, GRIND PCC, MGS AND END TREATMENTS.SAN DIEGO COUNTY IN SAN DIEGO FROM NIMITZ BOULEVARD TO 0.2 MILE WEST OF PRESIDIO PARK OVERCROSSING09/07/20181 (04/03/2017)Details CEM-3701 Report
6375Project ID: 6375
DEA: 11402304
EFIS: 1100000536
11-SD-56-6.8/8.7RECYCLED WATER CONVERSION.SAN DIEGO COUNTY IN SAN DIEGO FROM PENASQUITOS CREEK BRIDGE TO 0.3 MILE WEST OF ROUTE 56/15 SEPARATION04/23/20141 (06/01/2010)Details CEM-3701 Report
212700Project ID: 212700
DEA: 11415304
EFIS: 1113000018
11-SD-163-2.5/4.0HFST, ENHANCE STRIPING AND LIGHTING, INSTALL CONCRETE BARRIER AND MGSSAN DIEGO COUNTY IN SAN DIEGO FROM ROBINSON AVENUE OVERCROSSING TO SAN DIEGO RIVER BRIDGE10/02/20191 (02/28/2018)Details CEM-3701 Report