Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15061-15070 of 17257 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
5453 | Project ID: 5453 DEA: 09345104 | 09-INY-168-13.5/15.0 | Shoulder widening and place HMA (Open Graded) overlay. | INYO COUNTY NEAR BISHOP FROM ED POWERS ROAD TO RED HILL ROAD | 12/20/2010 | 1 (12/20/2010) | Details CEM-3701 Report |
210280 | Project ID: 210280 DEA: 09356004 EFIS: 0912000055 | 09-MNO--0.8/2.4 | SHOULDER WIDENING AND PLACE SHOULDER RUMBLE STRIP. | MONO COUNTY NEAR CHALFANT FROM 0.1 MILE NORTH OF PUMICE MILL ROAD TO 0.3 MILE NORTH OF WHITE MOUNTAIN ESTATES ROAD | 12/10/2015 | NOT VERIFIED | Details CEM-3701 Report |
603 | Project ID: 603 DEA: 02381604 | 02-LAS-395-30.7 | SHOULDER WIDENING AND RUMBLE STRIP | IN LASSEN COUNTY AT AND NEARMILFORD FROM 1.5 KM NORTH OFGARNIER ROAD TO 0.6 KM NORTH OF SUNNYSIDE ROAD | 12/23/2010 | 1 (03/05/2007) | Details CEM-3701 Report |
5409 | Project ID: 5409 DEA: 09338404 | 09-INY-190-68.9 | Shoulder widening for brake check area. | INYO COUNTY IN DEATH VALLEY NATIONAL PARK AT TOWNE PASS | 12/20/2010 | 1 (12/20/2010) | Details CEM-3701 Report |
466 | Project ID: 466 DEA: 021E5804 | 02-MOD-299-0.3 | SHOULDER WIDENING WITH DRAINAGE IMPROVEMENTS | MODOC COUNTY NEAR ADIN AT 139 | 12/11/2012 | NOT VERIFIED | Details CEM-3701 Report |
8141 | Project ID: 8141 DEA: 023E6904 EFIS: 0200020134 | 02-MOD-299-35.7/36.2 | SHOULDER WIDENING WITH HMA OVER AB. | MODOC COUNTY NEAR ALTURAS FROM 1.4 MILES TO 0.9 MILE WEST OF CROWDER FLAT ROAD | 01/30/2015 | 1 (12/10/2012) | Details CEM-3701 Report |
7316 | Project ID: 7316 DEA: 09352604 EFIS: 0900020112 | 09-MNO-6-4.0/5.5 | SHOULDER WIDENING WITH HMA. | MONO COUNTY AT AND NEAR CHALFANT FROM 0.4 MILE SOUTH OF HUNTER AVENUE TO 0.7 MILE SOUTH OF PETROGLYPH ROAD | 02/07/2013 | 1 (07/17/2012) | Details CEM-3701 Report |
213581 | Project ID: 213581 DEA: 051C6504 EFIS: 0512000185 | 05-SCR-9-22.1/23.8 | SHOULDER WIDENING, DRAINAGE, GUARDRAIL AND RUMBLE STRIP WORK | SANTA CRUZ COUNTY ABOUT 6.2 MILES NORTH OF BOULDER CREEK FROM 5.0 MILES TO 3.3 MILES SOUTH OF ROUTE 35 | 02/20/2020 | 1 (02/14/2019) | Details CEM-3701 Report |
210233 | Project ID: 210233 DEA: 01493704 EFIS: 0100000478 | 01-HUM-96-11.0/R13.2 | SHOULDER WIDENING, HMA OVERLAY, RADAR SIGN AND LED CROSSING SYSTEMS | HUMBOLDT COUNTY IN HOOPA FROM LOOP ROAD TO 0.1 MILE WEST OF HOSTLER CREEK BRIDGE 04-294 | 06/28/2017 | 1 (09/23/2015) | Details CEM-3701 Report |
210624 | Project ID: 210624 DEA: 120N1404 EFIS: 1213000125 | 12-ORA-57-20.7/21.2 | SHOULDER WIDENING, MODIFY CURBS, GUTTER, AND DRAINAGE | ORANGE COUNTY, IN BREA, FROM LAMBERT ROAD SOUTHBOUND ON RAMP TO 0.2 MILE NORTH OF LAMBERT ROAD UNDERCROSSING | 11/29/2016 | 1 (11/17/2015) | Details CEM-3701 Report |