Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15061-15070 of 15954 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
3385 | Project ID: 3385 EFIS: 0000001155 Permit Numbers: 0610NUT0022 | 06-TUL-190-10.91/10.91 | The Project consists of the construction of two parallel reinforced concrete box culverts across State Route 190 that will have a combined design flow of 150 CFS. The contractor will USA construction area and pothole all existing utilities, provide traffic | SR180, Porterville | 07/30/2018 | 2 (12/05/2014) | Details Personnel CEM-3701 Report |
212302 | Project ID: 212302 DEA: 080C70U4 EFIS: 0815000189 COOP: 081646 | 08-SBD-210-PM R 25 | The SR 210 Base Line Interchange project, in the City of Highland, includes widening of the Base Line overcrossing at the SR 210, along with additional ramp widening improvements for the northbound on-ramp, northbound off-ramp and southbound on-ramps. | SR210 Lane Addition work proposes to improve SR 210 within the cities of Highland, Redlands, San Bernardino and unincorporated sections of San Bernardino County, | 2 (01/15/2020) | Details Personnel CEM-3701 Report | |
209107 | Project ID: 209107 Permit Numbers: 0212NSN0401 | 02-SHA-299-25.2/25.7 | Construct improvements to the SR299/Churn Creek Road Intersection in accordance with signed and stamped approved plans dated April 5, 2013, specifications, and all approved addendums to include; AC overlay of eastbound on and off-ramps, eastbound off-ramp signalization at Churn Creek Road, overlay, | SR299/Churn Creek interchange, Redding | 04/05/2017 | 2 (06/20/2014) | Details Personnel CEM-3701 Report |
3376 | Project ID: 3376 Permit Numbers: 06106DP0087 | 06-FRE-33-61.18 | Reconstruct Bass Avenue intersection at FRE/33/62.506 with new left turn lane in SB FRE/33, new right turn lane in NB FRE/33 and new signal system. Construct a new public road approach at FRE/33/62.705 (Lozano Street). | SR33 | 04/27/2018 | 2 (12/05/2014) | Details Personnel CEM-3701 Report |
3030 | Project ID: 3030 Permit Numbers: 0608NSN1013 | 06-FRE-33-61.18/61.18 | The proposed project includes the widening of State Route 33. In conjunction with said widening, striping, signage, pavement and concrete walk/returns are to be constructed. The installation of traffic signals are proposed at the intersection of Bass Av | SR33, Mendota | 04/27/2018 | 2 (11/25/2014) | Details Personnel CEM-3701 Report |
210535 | Project ID: 210535 Permit Numbers: 0614NOP0442 0615NRW0472 | 06-KER-46-49/49 | Enter upon the State Highway Right-of-way on State Route 46 (SR-46) in Wasco at and near the SR-46 (Paso Robles Highway)/Central Avenue Intersection (PM 49.5) to set up, maintain, and remove temporary traffic control necessary in order to construct the City of Wasco?s Central Avenue, and Margalo St | SR46 (Paso Robles Hwy), Wasco | 04/04/2019 | 1 (06/17/2015) | Details Personnel CEM-3701 Report |
213332 | Project ID: 213332 Permit Numbers: 06186SN0167 06186RT1205 | 06---20.41/20.66 | Enter upon right of way of Hwy.-46 @ Hwy.-33 to setup & maintain required traffic control to remove the existing signal standards & MBGR, replace with a new Type 23-3-100 signal standards & Type 16B MBGR per the attached approved plans. | SR46, Lost Hills | 11/30/00-1 | 1 (12/07/2018) | Details Personnel CEM-3701 Report |
3038 | Project ID: 3038 DEA: 060J8604 EFIS: 0600000202 COOP: 061395 Permit Numbers: 0609NSN0311 0609NDP0434 | 06-KER-58-58.4 | RTE 58 /FAIRFAX ROAD OVERCROSSING INTERCHANGE; INSTALL NEW TRAFFIC SIGNALS | SR58, Bakersfield | 06/04/2020 | 2 (06/05/2018) | Details Personnel CEM-3701 Report |
208826 | Project ID: 208826 DEA: 060G8504 EFIS: 0600020167 COOP: 061535 Permit Numbers: 0613NMC0437 | 06-KER-58-52.7/55.5 | Enter upon the State Highway Right-of-way on State Route 58 (SR-58) in Bakersfield near the SR-58/SR-99 Separation at SR-58/Hughes Lane Overcrossing (PM R52.7) to set up, maintain, and remove temporary traffic control necessary in order to construct the C | SR58, Bakersfield | 08/27/2018 | 2 (07/24/2013) | Details Personnel CEM-3701 Report |
5524 | Project ID: 5524 EFIS: 0000001155 Permit Numbers: 1007NMC0669 10086DP0495 | 10-AMA-88-22.69/22.69 | Construct new right turn lane, lengthen storage of left turn, modify existing signal and loops, as shown on the attached plans and electrical specifications, within State Highway 88 right of way at Ridge Road in the Town of Pine Grove in Amador County. T | SR88 @ Ridge Road, Pine Grove | 02/24/2014 | NOT VERIFIED | Details Personnel CEM-3701 Report |