Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15031-15040 of 17549 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213211 | Project ID: 213211 DEA: 030G1204 | 03-SUT-20-R0.2/4.2 | RUBBERIZED ASPHALT CONCRETE OVERLAY | SUTTER COUNTY NEAR MERIDIAN FROM 0.1 MILE EAST OF MERIDIAN ROAD TO SUTTER BYPASS BRIDGE | 01/02/2019 | NOT VERIFIED | Details CEM-3701 Report |
210067 | Project ID: 210067 DEA: 043E4204 | 04-SCL-35-14.1/17.1 | RUBBERIZED ASPHALT CONCRETE OVERLAY. | SANTA CLARA COUNTY NEAR SARATOGA FROM ROUTE 9 TO SAN MATEO COUNTY LINE | 08/22/2018 | 1 (12/09/2014) | Details CEM-3701 Report |
5625 | Project ID: 5625 DEA: 100M3604 | 10-STA-132-45.2/48.8 | Rubberized asphalt concrete surfacing and shoulder backing. | 04/08/2011 | 1 (05/24/2007) | Details CEM-3701 Report | |
247 | Project ID: 247 DEA: 01478904 | 01-MEN-101-R0.1/9.2,11.7/R21.1 | RUBBERIZED BONDED WEARING COURSE | 12/23/2010 | 1 (11/13/2008) | Details CEM-3701 Report | |
209259 | Project ID: 209259 DEA: 043E4004 EFIS: 0412000303 | 04-NAP-128-19.1/34.3 | RUBBERIZED BONDED WEARING COURSE -GAP GRADED OVERLAY. | NAPA COUNTY NEAR NAPA FROM KNOXVILLE ROAD TO SOLANO COUNTY LINE... | 06/29/2015 | 1 (04/25/2016) | Details CEM-3701 Report |
7338 | Project ID: 7338 DEA: 010A8004 EFIS: 0100020379 | 01-MEN-128-R26.8/30.7 | RUBBERIZED HMA | MENDOCINO COUNTY AT BOONVILLE FROM 0.2 MILE EAST OF PEACHLAND ROAD TO ROBINSON CREEK BRIDGE | 09/17/2012 | 1 (07/16/2012) | Details CEM-3701 Report |
213804 | Project ID: 213804 DEA: 051K2904 EFIS: 0518000150 | 05-SBT-156-10.8 | RUBBERIZED HMA | 12/30/2019 | 1 (12/30/2019) | Details CEM-3701 Report | |
5758 | Project ID: 5758 DEA: 100S4304 | 10-SJ-205-L0.0/R3.2 | RUBBERIZED HMA (GAP GRADED) OVERLAY AND FOG SEAL COAT | SJ county | 11/23/2009 | 1 (12/07/2009) | Details CEM-3701 Report |
208617 | Project ID: 208617 DEA: 051A4004 EFIS: 0500020324 | 05-SB-246-31.4/34.6 | RUBBERIZED HMA (GAP GRADED) OVERLAY ON EXISTING ROADWAY. | SANTA BARBARA COUNTY NEAR SOLVANG FROM ENTRANCE ROAD TO ROUTE 154 | 01/17/2014 | NOT VERIFIED | Details CEM-3701 Report |
5385 | Project ID: 5385 DEA: 09332104 | 09-INY-395-R11.8/25.9 | RUBBERIZED HMA (OPEN GRADED HIGH BINDER) | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |