Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15021-15030 of 16001 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1793 | Project ID: 1793 DEA: 040G4604 EFIS: 0400000334 COOP: 042314 Permit Numbers: 0411NMC0901 0411NRW1894 | 04-SCL-237-4.69/9.33 | Caltrans is proposing to construct the project which involves conversion of existing high occupancy vehicle (Hov)direct connector ramps at the SR 237/ I-880 Interchange to express lanes, with single occupant vehicles permitted by paying a toll. | SR 237, I-880, Var | 08/21/2018 | 1 (07/05/2011) | Details Personnel CEM-3701 Report |
208632 | Project ID: 208632 DEA: 050T9204 EFIS: 0500020194 COOP: 05CA0254 Permit Numbers: 0512NSN0241 | 05-SB-246-8.78/9.15 | Install traffic signal, safety lighting, signal interconnect, and reconstruct four curb ramps at the intersection of State Route 246 and R Street as shown on the attached plans, as directed by cooperative agreement 05-CA-0254 and as directed by the permi | SR 246, Lompoc | 09/17/2018 | 2 (03/14/2013) | Details Personnel CEM-3701 Report |
209006 | Project ID: 209006 Permit Numbers: 10136UL0322 | 10-SJ-26-1.38/1.38 | Trench to place one 26"x55"x4' high cabinet on 6'x9' concrete pad; from new cabinet location, trench 10'east to existing joint pole, bore 160' east along edge of right of way to existing cabinet, and trench 132' west along edge of right of way to existing | SR 26, Stockton | 12/04/2018 | 1 (08/07/2014) | Details Personnel CEM-3701 Report |
210422 | Project ID: 210422 DEA: 07297604 EFIS: 0713000212 | 07-LA-27-13.3/13.7 | Westfield West Valley Offsite Improvements | SR 27 Topanga Canyon Boulevard Widening | 08/17/2021 | 2 (10/01/2014) | Details Personnel CEM-3701 Report |
215111 | Project ID: 215111 Permit Numbers: 0220NSN0268 0219NUE0397 02216DP0201 0221NRT0548 | 02---52.5/52.65 | New encroachment for signalized intersection construction for Phase 2 of County Road 266 (lance Gulch Road aka East Connector) where it intersects with State Highway 299 and Glen Road. Work includes removal of existing stop signs, flashing beacons, and intersection lighting, construction of new tr | SR 299 / Glen Road / Lance Gulch Road, Weaverville | 1 (08/23/2021) | Details Personnel CEM-3701 Report | |
210055 | Project ID: 210055 Permit Numbers: 1012NMC0750 | 10-SJ-4-17.61/17.61 | Install Emergency Vehicle Preemption System at the intersections of State Highway 4 westbound ramps and Wilson Way, and State Highway 4 eastbound ramps and Wilson, as shown on the approved plans. The work also includes the installation of a City of Stockton Pan-Tilt Zoom (PTZ) Closed-Circuit Telev | SR 4, Stockton | 02/06/2015 | 1 (11/17/2014) | Details Personnel CEM-3701 Report |
212923 | Project ID: 212923 Permit Numbers: 1016NMC0531 1017NRT0598 | 10---18.6 | Install and maintain in perpetuity the Emergency Vehicle Preemption System at the intersection of Filbert Street and the on/off ramps of State Route 4 in Stockton, as shown on the approved plans. The preemption system will include the installation of Optical detectors on the traffic signal poles, | SR 4, Stockton | 01/22/2020 | 1 (12/05/2017) | Details Personnel CEM-3701 Report |
213900 | Project ID: 213900 Permit Numbers: 10186RC0212 1019NRD0156 10196RT0567 10196RW0626 | 10---19.866 | Construct a commercial driveway located at the intersection of Stagecoach and East Farmington Road/ State Highway 4 in the City of Stockton. Work includes removing existing driveway and culvert, installing new driveway and culverts, installing driveway curb, valley gutter, curb cut, removing traffi | SR 4, Stockton | 11/09/2021 | 1 (08/15/2019) | Details Personnel CEM-3701 Report |
993216 | Project ID: 993216 Permit Numbers: 10206MC0848 1021NRD0810 10226RT0042 | 10---15.078 | Improve State Highway 4 right of way located at the intersection of Fresno Avenue in the City of Stockton. Work includes pavement widening, new and improve pedestrian facilities, replacing existing pork chop divider, construction of new curb ramps, traffic signal modifications, drainage improvement | SR 4, Stockton | 08/29/2022 | 1 (08/25/2021) | Details Personnel CEM-3701 Report |
215737 | Project ID: 215737 Permit Numbers: 0418NOP1441 0420NRT2951 0420NRT2952 | 04---11.2/15.5 | The project proposes widening the inside median of SR4 in both directions from east of Milano Way/Glacier Drive to east of SR242.Widen State Route 4 from inside median in both direction from east of Milano/Glacier Drive to State Route 242, outside widening of State Route 4 of both directions from P | SR 4/680 Interchange and SR4 widening , Martinez and Concord | NOT VERIFIED | Details Personnel CEM-3701 Report |