Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14891-14900 of 17549 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
212498 | Project ID: 212498 DEA: 021H5204 EFIS: 0217000009 | 02-SIS-3,263-48.5/49.7 - 49.41 | Roadway Rehabilitation | 02-Sis-3, 263-R46.8/R48.0, 49.07/49.41 | 1 (06/06/2017) | Details CEM-3701 Report | |
6206 | Project ID: 6206 DEA: 11289704 | 11-SD-15-R42.5/R45.9 | ROADWAY REHABILITATION (LANE REPLACEMENT). | SAN DIEGO COUNTY ABOUT 11.2 MILES NORTH OF ESCONDIDO FROM 0.8 MILE SOUTH OF ESCONDIDO HIGHWAY OVERCROSSING TO SAN LUIS REY RIVER BRIDGE | 10/19/2011 | 1 (12/27/2011) | Details CEM-3701 Report |
211616 | Project ID: 211616 DEA: 050G0404 EFIS: 0500020020 | 05-SLO,MON-101-63.2/R69.3,R0.0/R1.9 | ROADWAY REHABILITATION AND BRIDGE CONSTRUCTION. | SAN LUIS OBISPO AND MONTERY COUNTIES NEAR PASO ROBLES FROM 0.5 MILE SOUTH OF SAN MARCOS CREEK BRIDGE TO 0.2 MILE SOUTH OF BRADLEY ROAD OVERCROSSING | 10/29/2020 | 1 (09/15/2016) | Details CEM-3701 Report |
7043 | Project ID: 7043 DEA: 10264444 EFIS: 1000000378 | 10-AMA-88-0.0/5.5 | ROADWAY REHABILITATION AND BRIDGE WIDENING. | AMADOR COUNTY ABOUT 7 MILES EAST OF CLEMENTS FROM SAN JOAQUIN COUNTY LINE TO ROUTE 124 | 11/17/2014 | 1 (05/23/2012) | Details CEM-3701 Report |
6376 | Project ID: 6376 DEA: 11402604 | 11-SD-905-7.5/7.8 | Roadway rehabilitation and traffic signal modification. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 MILE WEST TO 0.1 MILE EAST OF HERITAGE ROAD | 09/30/2010 | 1 (01/03/2011) | Details CEM-3701 Report |
209288 | Project ID: 209288 DEA: 024F4004 EFIS: 0212000106 | 02-TRI-36-15.8/16.0 | ROADWAY REHABILITATION TO CORRECT PROFILE, CROSS SLOPES AND DRAINAGE | TRINITY COUNTY NEAR FOREST GLEN FROM 1.0 MILE WEST TO 0.7 MILE WEST OF GLEN CREEK ROAD | 11/21/2014 | 1 (06/20/2014) | Details CEM-3701 Report |
7657 | Project ID: 7657 DEA: 100M7804 EFIS: 1000000128 | 10-SJ-5-25.1/28.6 | ROADWAY REHABILITATION WITH CRCP AND HMA. | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM 0.3 MILE SOUTH OF CHARTER WAY UNDERCROSSING TO 0.2 MILE NORTH OF COUNTRY CLUB BOULEVARD UNDERCROSSING | 04/13/2018 | 1 (10/29/2012) | Details CEM-3701 Report |
1877 | Project ID: 1877 DEA: 041A6824 EFIS: 0400020137 | 04-ALA-880-28.2/29.9 | ROADWAY REHABILITATION, CRACK AND SEAT AND OVERLAY CONCRETE PAVEMENT | ALAMEDA COUNTY IN OAKLAND FROM 0.5 MILE NORTH OF THE HIGH STREET SEPARATION OVERHEAD TO 0.5 MILE SOUTH OF THE FIFTH AVENUE OVERHEAD | 01/14/2016 | 1 (04/11/2012) | Details CEM-3701 Report |
10 | Project ID: 10 DEA: 010A1604 EFIS: 0100020021 | 01-DN-101-7.6/8.69 | Roadway Repair | In Del Norte County Near Klamath , 3.56 miles North to 4.65 miles North of the Klamath River Bridge | 05/24/2011 | 1 (05/24/2011) | Details CEM-3701 Report |
212483 | Project ID: 212483 DEA: 101H6104 EFIS: 1017000163 | 10-ALP-4-22.0/23.6 | Roadway Repair | On state route 4 from 0.6 to 2.2 mile west of silver creek camp in alpine county | 08/02/2023 | 1 (04/11/2019) | Details CEM-3701 Report |