Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14861-14870 of 15340 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
8142Project ID: 8142
DEA: 060M8004
EFIS: 0600020012
06-MAD,MAD-65,99-25.2/25.6,23.3/23.8CONSTRUCT THRIE BEAM AND CONCRETE MEDIAN BARRIERTULARE AND MADERA COUNTIES ON ROUTE 65 FROM 0.1 MILES NORTH OF AVENUE 196 TO 0.1 MILES SOUTH OF AVENUE 200 AND ON ROUTE 99 FROM 0.2 MILES NORTH OF CALIFA UNDERPASS TO AVENUE 24 OVERCROSSING05/28/20131 (12/10/2012)Details Personnel CEM-3701 Report
213669Project ID: 213669
DEA: 06324524
EFIS: 0617000065
MINOR: 06A2459
06-TUL-52.5-KINGS RIVER MITIGATION PLANT ESTABLISHMENTTulare County 1 (01/31/2020)Details Personnel CEM-3701 Report
993284Project ID: 993284
DEA: 060U7704
EFIS: 0616000035
06-TUL-99-22.3INSTALL WATER/WASTEWATER SYSTEMS AND LANDSCAPE WORK.TULARE COUNTY 3 MILES NORTH OF TIPTON AT THE PHILIP S RAINE SAFETY ROADSIDE REST AREA 1 (10/04/2021)Details Personnel CEM-3701 Report
209069Project ID: 209069
DEA: 060N3904
EFIS: 0600020698
06-TUL-245-20.8CONSTRUCT ROCK SLOPE PROTECTION.TULARE COUNTY ABOUT 10 MILES SOUTH OF BADGER AT COTTONWOOD CREEK BRIDGE08/06/20151 (10/15/2014)Details Personnel CEM-3701 Report
209146Project ID: 209146
DEA: 06471504
EFIS: 0600000464
COOP: 061549
06-TUL-99-39.6/41.3RECONSTRUCT INTERCHANGE WITH NEW PUMPING PLANT.TULARE COUNTY AT GOSHEN FROM 0.9 MILE NORTH OF ROUTE 99/198 WEST SEPARATION TO 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD03/03/20201 (10/08/2013)Details Personnel CEM-3701 Report
3201Project ID: 3201
DEA: 060G9304
06-TUL-65,99,137,190,198,216-VarCONSTRUCT CONCRETE CURB RAMPS AND MODIFY SIGNAL AND LIGHTING.TULARE COUNTY AT VARIOUS LOCATIONS04/27/20111 (04/27/2011)Details Personnel CEM-3701 Report
3293Project ID: 3293
DEA: 060K4404
06-TUL-65,99,137,198-VarSEAL BRIDGE DECKS WITH METHACRYLATE, REPLACE JOINT AND CHIP SEALS.TULARE COUNTY AT VARIOUS LOCATIONS12/13/20121 (02/28/2011)Details Personnel CEM-3701 Report
214843Project ID: 214843
DEA: 060X6704
EFIS: 0618000229
06-TUL-63,65,99,190,198-VarREPLACE BRIDGE DECK WITH POLYESTER CONCRETE OVERLAY & PLACE CONCRETE.TULARE COUNTY AT VARIOUS LOCATIONS07/15/20211 (04/20/2020)Details Personnel CEM-3701 Report
215555Project ID: 215555
DEA: 061A9804
EFIS: 0620000145
06-TUL-65,190,198,245-VarCOLD PLANE AND REPLACE WITH HMA AND RESURFACE WITH CHIP SEAL.TULARE COUNTY AT VARIOUS LOCATIONS 1 (03/10/2021)Details Personnel CEM-3701 Report
6843Project ID: 6843
DEA: 060E0704
EFIS: 0600020126
06-TUL-99-19.8/25.0WIDEN SHOULDERS, CRACK, SEAT AND OVERLAY SOUTHBOUND WITH HMA AND RHMA.TULARE COUNTY FROM 0.3 MILE NORTH OF AVENUE 152 OVERCROSSING TO ELK BAYOU BRIDGE05/31/20131 (02/27/2012)Details Personnel CEM-3701 Report