Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14821-14830 of 17278 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
211097 | Project ID: 211097 DEA: 030G1104 EFIS: 0314000077 | 03-BUT-32-R19.0/R23.9 | RUBBERIZED HOT MIX ASPHALT (GAP GRADED) OVERLAY. | NEAR CHICO FROM LA CASTANA DRIVE TONOPEL AVE | 11/28/2016 | 1 (01/20/2016) | Details CEM-3701 Report |
209529 | Project ID: 209529 DEA: 034M8204 EFIS: 0313000072 | 03-SAC-5,99-29.5/30.5,32.1/36.9 | RUBBERIZED HOT MIX ASPHALT (OPEN GRADED) OVERLAY | SACRAMENTO COUNTY IN AND NEAR SACRAMENTO FROM 5/99 SEPARATION TO 1.3 MILES NORTH OF ELKHORN BOULEVARD OVERCROSSING AND FROM 0.5 MILE NORTH OF ELVERTA ROAD OVERCROSSING TO SUTTER COUNTY LINE | 02/06/2015 | 1 (05/20/2014) | Details CEM-3701 Report |
213297 | Project ID: 213297 DEA: 010H3704 EFIS: 0117000165 | 01-LAK-20-33.6/37.1,45.2/46.5 | RUBBERIZED HOT MIX ASPHALT - GAP GRADED AND MIDWEST GUARDRAIL SYSTEM | LAKE COUNTY NEAR CLEARLAKE OAKS FROM 0.6 MILE EAST OF NEW LONG VALLEY ROAD TO NORTH FORK CACHE CREEK BRIDGE AND FROM 1.4 MILES EAST OF ABBOT MINE ROAD TO COLUSA COUNTY LINE | 12/04/2018 | 1 (04/27/2018) | Details CEM-3701 Report |
6768 | Project ID: 6768 DEA: 120K5904 | 12-ORA-241-27.9/39.0 | Rubberized Hot Mix Asphalt - Type O overlay | ORANGE COUNTY IN IRVINE AND IN NEAR ANAHEIM AND YORBA LINDA FROM 0.8 MILE SOUTH OF HAUL ROAD UNDERCROSSING TO ROUTE 91/241 SEPARATION | 12/19/2011 | 1 (12/19/2011) | Details CEM-3701 Report |
210370 | Project ID: 210370 DEA: 042J2804 EFIS: 0414000472 | 04-SOL-780-0.5/7.4 | RUBBERIZED HOT MIX ASPHALT CONCRETE SURFACING.. | SOLANO COUNTY IN BENICIA AND VALLEJO FROM PARK ROAD UNDERCROSSING TO LEMON STREET | 08/22/2018 | 1 (04/15/2015) | Details CEM-3701 Report |
210416 | Project ID: 210416 DEA: 081C1104 | 08-RIV-371-56/61.9,72.9/77.2 | RUBBERIZED HOT MIX ASPHALT GAP GRADED AND LOCALIZED DIG-OUT | RIVERSIDE COUNTY AT AGUANGA FROM ROUTE 79 TO 0.78 MILE WEST OF BRADFORD ROAD AND AT ANZA FROM 0.08 MILE EAST OF KIRBY ROAD TO ROUTE 74 | 07/05/2023 | 1 (10/15/2015) | Details CEM-3701 Report |
9 | Project ID: 9 DEA: 010A1404 EFIS: 0100020019 | 01-MEN-128-0.0/11.6 | RUBBERIZED HOT MIX ASPHALT OVERLAY | MENDOCINO COUNTY NEAR NAVARRO FROM ROUTE 1 TO FLYNN CREEK BRIDGE | 12/10/2012 | NOT VERIFIED | Details CEM-3701 Report |
3252 | Project ID: 3252 DEA: 060J4004 | 06-KER-46,58,99-VAR | RUBBERIZED HOT MIX ASPHALT OVERLAY | 04/21/2011 | 1 (05/19/2009) | Details CEM-3701 Report | |
6141 | Project ID: 6141 DEA: 11277704 | 11-SD-79-20.2/35.3 | RUBBERIZED HOT MIX ASPHALT OVERLAY | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report | |
6850 | Project ID: 6850 DEA: 120L6404 EFIS: 1200020104 | 12-ORA-1-23.7/25.9 | RUBBERIZED HOT MIX ASPHALT OVERLAY | ORANGE COUNTY IN HUNTINGTON BEACH FROM BEACH BOULEVARD TO GOLDENWEST STREET | 05/29/2013 | 1 (07/22/2012) | Details CEM-3701 Report |