Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14821-14830 of 16001 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
8218 | Project ID: 8218 DEA: 040A0904 EFIS: 0400000133 COOP: 042546 | 04-SOL--R24.8/R25.2 | WIDEN BRIDGE, CONSTRUCT DRAINAGE SYSTEMS AND CONCRETE BARRIER. | SOLANO COUNTY IN AND NEAR VACAVILLE FROM 0.2 MILE WEST OF ALAMO CREEK BRIDGE TO 0.2 MILE EAST OF ALAMO CREEK BRIDGE | 12/21/2017 | 1 (01/24/2013) | Details Personnel CEM-3701 Report |
209532 | Project ID: 209532 DEA: 043E3604 EFIS: 0412000299 | 04-SOL-37-0.1/7.4 | COLD PLANE PAVEMENT AND PLACE RUBBERIZED HOT MIX ASPHALT. | SOLANO COUNTY IN AND NEAR VALLEJO FROM SONOMA CREEK BRIDGE TO NAPA RIVER BRIDGE | 08/22/2018 | NOT VERIFIED | Details Personnel CEM-3701 Report |
210370 | Project ID: 210370 DEA: 042J2804 EFIS: 0414000472 | 04-SOL-780-0.5/7.4 | RUBBERIZED HOT MIX ASPHALT CONCRETE SURFACING.. | SOLANO COUNTY IN BENICIA AND VALLEJO FROM PARK ROAD UNDERCROSSING TO LEMON STREET | 08/22/2018 | 1 (04/15/2015) | Details Personnel CEM-3701 Report |
211362 | Project ID: 211362 DEA: 041J7104 EFIS: 0414000332 | 04-SOL-780-1.4 | CONSTRUCT SHOULDER AND SINGLE THRIE BEAM BARRIER | SOLANO COUNTY IN BENICIA AT 0.2 MILE EAST OF EAST 5TH STREET UNDERCROSSING | 08/22/2018 | NOT VERIFIED | Details Personnel CEM-3701 Report |
215047 | Project ID: 215047 DEA: 044J0404 EFIS: 0415000246 | 04-SOL-680-R1.9 | ROADWAY EXC, CONCRETE (DITCH LINING) AND INSTALL EROSION CONTROL. | SOLANO COUNTY IN BENICIA AT 0.9 MILE SOUTH OF LAKE HERMAN ROAD OVER CROSSING | 01/21/2021 | 1 (10/19/2020) | Details Personnel CEM-3701 Report |
210390 | Project ID: 210390 DEA: 041J7604 EFIS: 0414000349 | 04-SOL-80-39.8 | BUILD MATERIALS STORAGE BINS WITH CANOPY. | SOLANO COUNTY IN DIXON AT THE DIXON MAINTENANCE STATION 8628 SPARLING LANE | 12/21/2017 | 1 (07/28/2015) | Details Personnel CEM-3701 Report |
211409 | Project ID: 211409 DEA: 043J6804 EFIS: 0415000327 | 04-SOL-113-20.4/21.2 | REPLACE ASPHALT CONCRETE PAVEMENT. | SOLANO COUNTY IN DIXON AT VARIOUS LOCATIONS FROM ATKINSON ROAD ROUTE 80 | 08/22/2018 | 1 (09/22/2016) | Details Personnel CEM-3701 Report |
2166 | Project ID: 2166 DEA: 042E3004 | 04-SOL-80-30.6/38.2 | REPLACE PORTLAND CEMENT CONCRETE SLABS. | SOLANO COUNTY IN DIXON FROM 0.7 MILE EAST OF LEISURE TOWN ROAD OVERCROSSING TO 1.4 MILES WEST OF PEDRICK ROAD OVERCROSSING | 07/29/2011 | 1 (07/29/2011) | Details Personnel CEM-3701 Report |
212262 | Project ID: 212262 DEA: 041K0704 EFIS: 0416000185 | 04-SOL-113-19.9/21.2 | HM1 - COLD PLANE AC PAVEMENT AND PLACE HMA (TYPE A). | SOLANO COUNTY IN DIXON FROM NORTH ADAMS STREET TO ROUTE 80 | 12/21/2017 | NOT VERIFIED | Details Personnel CEM-3701 Report |
212306 | Project ID: 212306 DEA: 041K1004 EFIS: 0416000188 | 04-SOL-12-L2.1/7.9 | HM1 - PLACE RHMA-G | SOLANO COUNTY IN FAIRFIELD AND SUISUN CITY FROM 0.1 MILE WEST OF CHADBOURNE ROAD TO 0.4 MILE EAST OF WALTERS ROAD | 04/24/2018 | 1 (07/19/2017) | Details Personnel CEM-3701 Report |