Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14791-14800 of 15574 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993298 | Project ID: 993298 DEA: 010G5804 EFIS: 0117000023 | 01-HUM-101,299-87.5/89.6,0.1 | INSTALL TEMPORARY RAILING, PLACE HMA AND VEGETATION CONTROL. | HUMBOLDT COUNTY IN AND NEAR ARCATA ON ROUTE 101 FROM SAINT LOUIS ROAD OVERCROSSING TO MAD RIVER BRIDGE AND ON ROUTE 299 AT 299/101 SEPARATION | 1 (10/12/2021) | Details Personnel CEM-3701 Report | |
993299 | Project ID: 993299 DEA: 022J3904 | 02-SHA-44-45.5/51.6 | HMA OVERLAY, REPLACE AC SURFACING AND SHOULDER BACKING. | SHASTA COUNTY NEAR VIOLA FROM 3.0 MILES EAST OF DEER FLAT ROAD TO 0.5 MILE EAST OF BRIDGE CREEK ROAD | 1 (10/18/2021) | Details Personnel CEM-3701 Report | |
993301 | Project ID: 993301 DEA: 060U2804 EFIS: 0615000293 | 06-TUL-245-1.4,4.2 | PRECAST PRESTRESSED CONCRETE BOX GIRDER AND SLAB, BRIDGE REMOVAL. | TULARE COUNTY NEAR WOODLAKE AT YOKOHL CREEK BRIDGE AND AT KAWEAH RIVER BRIDGE | 1 (10/11/2021) | Details Personnel CEM-3701 Report | |
993302 | Project ID: 993302 DEA: 081J2104 EFIS: 0817000240 | 08-SBD-60-R1.4 | PLACE LCB RAPID SETTING AND JOINTED PLAIN CONCRETE PAVEMENT. | SAN BERNARDINO COUNTY IN CHINO AT RAMONA AVENUE OVERCROSSING | 1 (10/27/2021) | Details Personnel CEM-3701 Report | |
993303 | Project ID: 993303 DEA: 09381504 EFIS: 0919000063 | 09-INY-168-32.7/36.5 | PLACE GABIONS, ROADWAY EXCAVATION, AND MINOR CONCRETE. | INYO COUNTY NEAR BIG PINE FROM 1.3 MILES EAST OF WHITE MOUNTAIN ROAD TO 5.1 MILES EAST OF WHITE MOUNTAIN ROAD. | 1 (10/27/2021) | Details Personnel CEM-3701 Report | |
993305 | Project ID: 993305 Permit Numbers: 04216US0226 | 04-SCL-880-7.4/7.5 | PG&E has a project coming up where we will be retiring in place a gas transmission pipeline under state highway 880. This pipeline needs to be retired in place rather than removed due to trenching across the highway would leave a big patch as well as causing severe traffic disruptions. Instead | Highway 880, Milpitas | 06/22/2022 | 1 (10/07/2021) | Details Personnel CEM-3701 Report |
993306 | Project ID: 993306 DEA: 100V7005 EFIS: 1000020357 MINOR: 10A2244 | 10-AMA-88-27.4/29.8 | Culvert Replacement | 1 (10/08/2021) | Details Personnel CEM-3701 Report | ||
993307 | Project ID: 993307 Permit Numbers: 0421NDP2901 | 04---40.4/41 | US-101/ De La Cruz Boulevard interchange improvement.Re-construct the US 10 I /De La Cruz Boulevard/ Trimble Road Interchange to improve traffic operations and connectivity for pedestrians and bicyclists. Work includes:i) Replacement of the existing De La Cruz Boulevard bridge overcrossing with an | US 101/ De La Cruz , San Jose | NOT VERIFIED | Details Personnel CEM-3701 Report | |
993308 | Project ID: 993308 Permit Numbers: 0421NOP2843 | 04---40.4/41 | US-101/ De La Cruz Boulevard interchange improvement. | US 101/ De La Cruz , San Jose | NOT VERIFIED | Details Personnel CEM-3701 Report | |
993309 | Project ID: 993309 DEA: 010G5504 EFIS: 0117000018 | 01-LAK-20-26.6 | INSTALL GUARDRAIL | LAKE COUNTY NEAR CLEARLAKE OAKS AT BERYL WAY | 1 (10/18/2021) | Details Personnel CEM-3701 Report |