Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14771-14780 of 17198 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
211251Project ID: 211251
Permit Numbers: 0316AOP0132
03-PLA-89-2.2/3.1Class I Bike TrailTrout Street, Homewood01/08/20191 (10/20/2016)Details CEM-3701 Report
993475Project ID: 993475
Permit Numbers: 0320NSN1372 0321NRT1538
03---8.433/8.622Citywide Systemic Safety Improvements ProjectWalnut St., Chico 1 (03/24/2022)Details CEM-3701 Report
995150Project ID: 995150
DEA: 034H5704
EFIS: 0318000334
Permit Numbers: 0322NOP2788
03-SAC-99-24.22/R24.28City street improvementsOn Broadway near 26th street Downtown Sacramento 1 (09/21/2023)Details CEM-3701 Report
3519Project ID: 3519
DEA: 07000004
07-LA-101-37.54/38.03CITY OF WESTLAKE VILLAGE ASFP PHASE II 08/01/2018NOT VERIFIEDDetails CEM-3701 Report
4685Project ID: 4685
Permit Numbers: 0806NSN0157
08-SBD-66-3.331CITY OF UPLAND, MODIFY THE TRAFFIC SIGNAL 07/29/2010NOT VERIFIEDDetails CEM-3701 Report
3596Project ID: 3596
EFIS: 0000001155
Permit Numbers: 07066DP1592 0705NSN2035
07-LA-1-19.65/19.86CITY OF REDONDO BEACH- REINSTALL THE SIDE STREET LOOPS OF THE EXISTING TRAFFIC SIGNAL 12/30/2010NOT VERIFIEDDetails CEM-3701 Report
213264Project ID: 213264
DEA: 022H9604
EFIS: 0217000035
COOP: 020161
Permit Numbers: 0219NMC0096
02-SHA-5-R12.1/R12.5City of Redding; I-5 NB Ramp at South Bonnyview Road Improvements, start construction May 2019, est finish Dec 2019; Scope includes type 1 retaining wall, traffic signal poles, freeway ramp luminaires, city street lights.I-5 in City of Redding, northbound on-ramp at Churn Creek Road Overcrossing (exit 675)05/13/20202 (03/04/2019)Details CEM-3701 Report
215072Project ID: 215072
DEA: 59000000
04---CITY OF PLEASANTON: 5 BRIDGES, 33C0454, 33C0099, 33C0453, 33C0461, AND 33C0462. BRIDGE PREVENTIVE MAINTENANCE PROJECT : Laurel Creek Dr0.4 mi W of Remove and replace existing Type A joint seal at both Alameda Pleasanton 33C0454 29 Laurel Creek Dr Laurel Creek Foothill Rd 97.7 abutment joints. 5,909.00 $53,000.00 $8.97 $46,920.90 $55,773.90 $6,079.10 $7,226.10 3 Install soffit access openings to provide access to box City of 400 ft  NOT VERIFIEDDetails CEM-3701 Report
4607Project ID: 4607
EFIS: 0000001155
Permit Numbers: 08056MC0599
08-RIV-79-5.73CITY OF MURRIETTA , INSTALL TRAFFIC SIGNAL, 07/29/2010NOT VERIFIEDDetails CEM-3701 Report
1522Project ID: 1522
EFIS: 0000001155
Permit Numbers: 0407NDP0375 0407NMC0195
04-SCL-85,82-21.8/22.1,18.8CITY OF MOUNTAIN VIEW; CONSTRUCT A CLASS 1 BIKE FACILTIY FROM TERMINUS ALONG 85 AT YUBA DR. TO SOUTH INCLUDING CONCRETE CULVERT UNDER RTE 82.05/04/2011NOT VERIFIEDDetails CEM-3701 Report