Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14751-14760 of 18143 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215696 | Project ID: 215696 Permit Numbers: 07206SN2586 | 07-VEN-- | New crosswalk and traffic signal modification | S. VENTURA AVENUE & THOMPSON BOULEVARD | 1 (04/13/2021) | Details CEM-3701 Report | |
6833 | Project ID: 6833 DEA: 12A12314 | 12-ORA-57-17.5 | Remove HOV Buffer Stripe & Install HOV Ingress/Egress Stripe | S/B SR-57 HOV Lane | 08/05/2010 | 1 (08/05/2010) | Details CEM-3701 Report |
6756 | Project ID: 6756 DEA: 120K3804 | 12-ORA-57-17.5 | HOV Lane REMOVE HOV BUFFER STRIPE AND INSTALL HOV INGRESS/EGRESS STRIPE | S/B SR-57 HOV LANE FROM ROLLING HILLS DR. UC TO NUTWOOD AVE. UC IN THE CITY OF FULLERTON | 08/05/2010 | 1 (08/05/2010) | Details CEM-3701 Report |
215738 | Project ID: 215738 DEA: 042Q8304 EFIS: 0419000056 COOP: 042803 | 04-ALA-680-4.8/5.0 | Improvements to the State Highway System | Sabercat Bridge and Trail connecting Ohlone College on the east side to future BART Station at Washington/Osgood and Blacow Road on the west, with a bicycle and pedestrian bridge over I-680 | 2 (09/07/2021) | Details CEM-3701 Report | |
209319 | Project ID: 209319 DEA: 032F9404 EFIS: 0312000038 Permit Numbers: 0312NSN0800 0314NRT0089 0313NDP0775 | 03-SAC-99-33/34 | Traffic signal insallation, intersection and pedestrian improvements | Sac 99, Sacramento | 02/06/2015 | 2 (02/14/2014) | Details CEM-3701 Report |
208850 | Project ID: 208850 DEA: 032F9304 EFIS: 0312000036 Permit Numbers: 0312NMC0801 | 03-SAC-99-13/13 | construct multi-use trail w/ bridge over HW | Sac 99/ Elk Grove Creek, Elk Grove | 08/24/2022 | 2 (05/10/2013) | Details CEM-3701 Report |
1000109 | Project ID: 1000109 DEA: 024J0304 EFIS: 0222000127 MINOR: 02A2254 | 02-SHA-5-R7/R9.7 | Fence | Sac River to Knighton | 05/15/2024 | 1 (02/12/2024) | Details CEM-3701 Report |
208719 | Project ID: 208719 DEA: 033F3204 EFIS: 0312000189 | 03-ED,SAC-5,50,51,80,99-VAR | PLACE THIN HIGH-FRICTION SURFACE TREATMENT AND OPEN-GRADED ASPHALT | SACRAMENTO AND EL DORADO COUNTIES AT VARIOUS LOCATIONS | 10/06/2014 | 1 (07/22/2013) | Details CEM-3701 Report |
993842 | Project ID: 993842 DEA: 032J0904 EFIS: 0321000184 | 03-SAC,ED-50-R7.5/23.1,0.0/R11.4 | INSTALL TRAFFIC STRIPING AND PAVEMENT MARKINGS. | SACRAMENTO AND EL DORADO COUNTIES AT VARIOUS LOCATIONS FROM BRADSHAW ROAD OVERCROSSING TO RED HAWK PARKWAY OFF RAMP SEPARATION | 01/23/2024 | 1 (05/17/2022) | Details CEM-3701 Report |
215404 | Project ID: 215404 DEA: 031H8204 EFIS: 0317000006 | 03-SAC,ED-50-15.7/23.1,0.0/R1.9 | INSTALL FIBER OPTIC CABLE AND WIRELESS COMMUNICATION SYSTEMS. | SACRAMENTO AND EL DORADO COUNTIES IN AND NEAR FOLSOM FROM HAZEL AVENUE TO SILVA VALLEY PARKWAY | 08/10/2023 | 1 (01/18/2021) | Details CEM-3701 Report |