Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14721-14730 of 17447 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993489Project ID: 993489
DEA: 030J7104
EFIS: 0320000005
03-ED-50-45.2ROADWAY EXCAVATION & INSTALL CONCRETE DRAINAGE INLET.EL DORADO COUNTY NEAR KYBURZ AT 1.4 MILES EAST OF ALDER CREEK ROAD 1 (01/05/2022)Details CEM-3701 Report
1747Project ID: 1747
DEA: 040T1644
04-SOL-80-12.8ROADWAY EXCAVATION AND CONCRETEIN SOLANO COUNTY IN FAIRFIELD ATSOLANO COMMUNITY COLLEGE07/29/20111 (07/29/2011)Details CEM-3701 Report
244Project ID: 244
DEA: 01478604
01-HUM-101-86.6,133.6ROADWAY EXCAVATION AND INSTALL ROCK SLOPE PROTECTION 12/23/20101 (10/14/2008)Details CEM-3701 Report
213973Project ID: 213973
DEA: 040J6604
EFIS: 0414000023
04-SCL-680-M0.0/M9.9ROADWAY EXCAVATION AND MINOR CONCRETE PAVING.SANTA CLARA COUNTY AT VARIOUS LOCATIONS07/23/20201 (06/04/2019)Details CEM-3701 Report
214915Project ID: 214915
DEA: 010E6504
EFIS: 0114000117
01-HUM-101,299-88.3,0.0ROADWAY EXCAVATION AND PLACE HMA (TYPE A) FOR CURVE REALIGNMENT.HUMBOLDT COUNTY IN ARCATA AT ROUTE 299/101 SEPARATION07/19/20231 (06/05/2020)Details CEM-3701 Report
214043Project ID: 214043
DEA: 01440604
EFIS: 0113000105
01-MEN-1-38.5/74.5ROADWAY EXCAVATION AND PLACE HMA (TYPE A).CONSTRUCTION ON STATE HIGHWAY IN MENDOCINO COUNTY AT VARIOUS LOCATIONS FROM 0.3 MILE SOUTH OF NAVARRO BLUFF ROAD TO 0.5 MILE SOUTH OF BLUE SLIDE GULCH BRIDGE.06/09/20211 (06/18/2019)Details CEM-3701 Report
214050Project ID: 214050
DEA: 09369804
EFIS: 0917000029
09-MNO-6-4.2/4.9ROADWAY EXCAVATION AND PLACE HMA (TYPE A).MONO COUNTY AT CHALFANT FROM 0.2 MILE SOUTH OF HUNTER AVENUE TO 0.3 MILE NORTH OF CHALFANT ROAD12/02/2019NOT VERIFIEDDetails CEM-3701 Report
993399Project ID: 993399
DEA: 09367204
EFIS: 0916000016
09-KER-202-R4.7/R5.2ROADWAY EXCAVATION AND PLACE HMA (TYPE A).KERN COUNTY NEAR TEHACHAPI FROM 0.2 MILE WEST OF CUMMINGS VALLEY ROAD EAST TO 0.3 MILE EAST OF CUMMINGS VALLEY ROAD EAST05/23/20231 (02/21/2022)Details CEM-3701 Report
214519Project ID: 214519
DEA: 040J1004
EFIS: 0413000408
04-SON-101-9.0ROADWAY EXCAVATION FOR SLIDE REMOVAL AND CONSTRUCT DITCH.SONOMA COUNTY NEAR PETALUMA AT 1.4 MILES NORTH OF OLD REDWOOD HIGHWAY05/24/20221 (10/30/2019)Details CEM-3701 Report
215600Project ID: 215600
DEA: 010H4604
EFIS: 0117000226
01-LAK-175-0.2/0.4ROADWAY EXCAVATION WITH CLASS 2 AGGREGATE BASE AND HMA (TYPE A).LAKE COUNTY ABOUT 10 MILES EAST OF HOPLAND FROM 0.2 MILE EAST OF THE MENDOCINO COUNTY LINE TO 0.4 MILE EAST OF THE MENDOCINO COUNTY LINE10/27/20211 (04/07/2021)Details CEM-3701 Report