Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14581-14590 of 17758 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215674 | Project ID: 215674 Permit Numbers: 0818NMC0281 0821NRT1208 0822NRT0068 08216RT1209 08226RT0070 | 08---43.637 | Enter onto Interstate 15 right of way at Second Street in the City of Norco to widen the south side of Second Street between Hamner Avenue and the I-15 southbound onramp by constructing new pavement, curb ramps at the southbound onramp, curb and gutter, cross gutter, sidewalk, and install signal mo | 2nd Street, Norco | 1 (06/23/2021) | Details CEM-3701 Report | |
215675 | Project ID: 215675 DEA: 022J1604 EFIS: 0221000035 | 02-SHA-89-29.1/29.4, 29.1 - 29.4 | Replace Lake Britton bridge rail damaged by collision. | Lake Britton Bridge | 09/27/2021 | 1 (04/08/2021) | Details CEM-3701 Report |
215676 | Project ID: 215676 DEA: 020J6404 EFIS: 0219000145 | 02-PLU-36-R13.6/R14.2 | A13 AT ROUTE 36 SAFETY | IN PLUMAS COUNTY NEAR CHESTER FROM 0.2 MILE WEST OF BAILEY CREEK BRIDGE TO 0.3 MILE EAST OF COUNTY ROAD A-13. | 1 (07/08/2021) | Details CEM-3701 Report | |
215678 | Project ID: 215678 Permit Numbers: 0418NMC2215 0420NRT2773 04216DP0668 | 04-SM-82,280-23.5-23.7/M27.16R,R25.98 | Construction of approximately 1,050 liner feet of new sidewalk, and curb and gutter, along the west side of El Camino Real from San Pedro road to A Street where there is currently no sidewalk. | San Pedro Rd. to A St., San Mateo County & Daly City | 03/13/2023 | 1 (04/14/2021) | Details CEM-3701 Report |
215679 | Project ID: 215679 DEA: 010J8604 EFIS: 0119000116 | 01-DN-101,199-VAR | FURNISH AND PLACE POLYESTER CONCRETE OVERLAY ON THE BRIDGE DECKS. | DEL NORTE COUNTY AT VARIOUS LOCATIONS | 10/20/2022 | 1 (04/28/2021) | Details CEM-3701 Report |
215680 | Project ID: 215680 DEA: 010K4804 EFIS: 0120000102 | 01-LAK-20-0.7/5.2,5.9/8.2 | RHMA OVERLAY, COLD PLANE AC PAVEMENT AND PRECOATED AGGREGATE. | LAKE COUNTY NEAR UPPER LAKE FROM 0.1 MILE WEST OF BLUE LAKES ROAD TO 0.4 MILE WEST OF WITTER SPRINGS ROAD AND FROM 0.1 MILE EAST OF BACHELOR CREEK BRIDGE TO 0. 1 MILE WEST OF ROUTE 29 | 04/26/2022 | 1 (04/28/2021) | Details CEM-3701 Report |
215681 | Project ID: 215681 DEA: 031G7604 EFIS: 0319000240 | 03-PLA,NEV-20,80-VAR | Remove, furnish and place polyester concrete overlay | 03-Pla,Nev-20, 80-VAR | 11/28/2022 | 1 (05/17/2021) | Details CEM-3701 Report |
215682 | Project ID: 215682 DEA: 031H1904 EFIS: 0316000065 | 03-SAC-80,244-M9.6/12.9,0.0/T0.8 | COLD PLANE AC PAVEMENT, PLACE RHMA AND INDIVIDUAL SLAB REPLACEMENT. | SACRAMENTO COUNTY IN AND NEAR SACRAMENTO ON ROUTE 80 FROM 0.2 MILE EAST OF LONGVIEW DRIVE OVERCROSSING TO 0.4 MILE EAST OF MADISON AVENUE OVERCROSSING AND ON ROUTE 244 FROM 0.3 MILE NORTH OF AUBURN BOULEVARD TO CONNECTOR TO ROUTE 80 | 1 (05/17/2021) | Details CEM-3701 Report | |
215683 | Project ID: 215683 DEA: 032H30A4 EFIS: 0317000092 | 03-NEV-80-19.3 | REPLACE LIGHT FIXTURES, OVERHEAD DOORS AND INSPECTION DESK STATIONS. | NEVADA COUNTY IN TRUCKEE AT THE DONNER PASS COMMERCIAL VEHICLE ENFORCEMENT FACILITY | 05/25/2022 | 1 (05/20/2021) | Details CEM-3701 Report |
215684 | Project ID: 215684 DEA: 043Q4104 EFIS: 0419000209 | 04-SCL-237-R0.2/R1.0 | COLD PLANE AC SURFACE AND OVERLAY WITH RHMA-G. | SANTA CLARA COUNTY IN MOUNTAIN VIEW FROM 0.2 MILE EAST OF ROUTE 82 TO EAST MOUNTAIN VIEW OVERHEAD | 06/22/2022 | 1 (04/29/2021) | Details CEM-3701 Report |