Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14571-14580 of 17201 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
493 | Project ID: 493 DEA: 02258504 | 02-LAS-395-11.8 | ROADWAY REHABILITATION | IN LASSEN COUNTY NEAR HALLELUJAH JUNCTION FROM 6.4 KM SOUTH OF LONG VALLEY CREEK BRIDGE TO 0.2 KM NORTH OF WILLOW RANCH CREEK BRIDGE | 03/11/2011 | 1 (03/02/2006) | Details CEM-3701 Report |
1800 | Project ID: 1800 DEA: 04128474 | 04-NAP-29-29.3 | ROADWAY REHABILITATION | IN NAPA COUNTY NEAR ST HELENA FROMYORK CREEK BRIDGE TO BALE LANE | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
6589 | Project ID: 6589 DEA: 120H0094 | 12-ORA-90,142-2.6/5.1,0.8/1.8 | ROADWAY REHABILITATION | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
208637 | Project ID: 208637 DEA: 024E3404 EFIS: 0200020273 | 02-LAS-147-0.5/1.2 | ROADWAY REHABILITATION | LASSEN COUNTY NEAR WESTWOOD FROM 0.3 MILE NORTH TO 0.5 MILE SOUTH OF SPRING CREEK DRIVE | 01/30/2015 | 1 (04/05/2013) | Details CEM-3701 Report |
210914 | Project ID: 210914 DEA: 07306204 EFIS: 0714000151 | 07-LA-91-R11.3/R20.7 | ROADWAY REHABILITATION | IN LOS ANGELES COUNTY, BETWEEN I-710 IN LONG BEACH AND 183RDSTREET IN CERRITOS | 04/09/2019 | 1 (10/14/2016) | Details CEM-3701 Report |
212498 | Project ID: 212498 DEA: 021H5204 EFIS: 0217000009 | 02-SIS-3,263-48.5/49.7 - 49.41 | Roadway Rehabilitation | 02-Sis-3, 263-R46.8/R48.0, 49.07/49.41 | 1 (06/06/2017) | Details CEM-3701 Report | |
6206 | Project ID: 6206 DEA: 11289704 | 11-SD-15-R42.5/R45.9 | ROADWAY REHABILITATION (LANE REPLACEMENT). | SAN DIEGO COUNTY ABOUT 11.2 MILES NORTH OF ESCONDIDO FROM 0.8 MILE SOUTH OF ESCONDIDO HIGHWAY OVERCROSSING TO SAN LUIS REY RIVER BRIDGE | 10/19/2011 | 1 (12/27/2011) | Details CEM-3701 Report |
211616 | Project ID: 211616 DEA: 050G0404 EFIS: 0500020020 | 05-SLO,MON-101-63.2/R69.3,R0.0/R1.9 | ROADWAY REHABILITATION AND BRIDGE CONSTRUCTION. | SAN LUIS OBISPO AND MONTERY COUNTIES NEAR PASO ROBLES FROM 0.5 MILE SOUTH OF SAN MARCOS CREEK BRIDGE TO 0.2 MILE SOUTH OF BRADLEY ROAD OVERCROSSING | 10/29/2020 | 1 (09/15/2016) | Details CEM-3701 Report |
7043 | Project ID: 7043 DEA: 10264444 EFIS: 1000000378 | 10-AMA-88-0.0/5.5 | ROADWAY REHABILITATION AND BRIDGE WIDENING. | AMADOR COUNTY ABOUT 7 MILES EAST OF CLEMENTS FROM SAN JOAQUIN COUNTY LINE TO ROUTE 124 | 11/17/2014 | 1 (05/23/2012) | Details CEM-3701 Report |
6376 | Project ID: 6376 DEA: 11402604 | 11-SD-905-7.5/7.8 | Roadway rehabilitation and traffic signal modification. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 MILE WEST TO 0.1 MILE EAST OF HERITAGE ROAD | 09/30/2010 | 1 (01/03/2011) | Details CEM-3701 Report |