Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14541-14550 of 17751 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993207Project ID: 993207
Permit Numbers: 04196SN2825 04206RT1409 04206RT2992 04216RT2271 04226RT0050
04---18.24Install two new traffic signals; one at the intersection of S. First Street and Chestnut Street and the other at the intersection of S. First Street and Valley Glen Drive; the S. First Street and Chestnut Street intersection include ADA ramp, crosswalk, drainage and asphalt updates on State HighwayS. First Street, Dixon10/14/20221 (10/22/2021)Details CEM-3701 Report
215636Project ID: 215636
DEA: 09385804
EFIS: 0920000046
09-KER-58-R129.4/R135.1,R143.2/R143.9COLD PLANE AC PAVEMENT AND PLACE HMA.KERN COUNTY NEAR BORON FROM 0.3 MILE WEST OF EDWARDS AFB OVERCROSSING TO 1.3 MILES WEST OF TWENTY MULE TEAM OVERCROSSING AND FROM 0.7 MILE WEST OF SAN BERNARDINO COUNTY LINE TO SAN BERNARDINO COUNTY LINE08/31/20211 (06/23/2021)Details CEM-3701 Report
215637Project ID: 215637
DEA: 09387804
EFIS: 0921000002
09-INY-395-R6.4/R15.0,115.2/116.1COLD PLANE AC PAVEMENT AND PLACE HMA (TYPE A).INYO COUNTY AT AND NEAR LITTLE LAKE FROM 6.6 MILES SOUTH TO 2.0 MILES NORTH OF CINDER ROAD AND IN BISHOP FROM SOUTH STREET TO MACIVER STREET08/30/20221 (06/23/2021)Details CEM-3701 Report
215638Project ID: 215638
DEA: 09387904
09-INY-190-111.6/126.1PLACE HMA OVER EXISTING PAVEMENT.INYO COUNTY NEAR FURNACE CREEK FROM 0.1 MILE WEST OF BAD WATER ROAD TO 3.6 MILES EAST OF DANTE'S VIEW ROAD01/18/20221 (06/23/2021)Details CEM-3701 Report
215639Project ID: 215639
DEA: 100S6804
EFIS: 1014000100
10-ALP-4,88,89-VarREPLACE CULVERTS, HEADWALLS AND REPLACE END TREATMENTS.ALPINE COUNTY AT VARIOUS LOCATIONS 1 (04/21/2021)Details CEM-3701 Report
215640Project ID: 215640
DEA: 101F4304
EFIS: 1016000058
10-MER-140-35.9/36.9SLURRY SEAL AND CONSTRUCT CURB RAMPS.MERCED COUNTY IN MERCED FROM ROUTE 99 NORTHBOUND OFF-RAMP TO KELLY AVENUE04/07/20221 (04/22/2021)Details CEM-3701 Report
215642Project ID: 215642
DEA: 101L6504
EFIS: 1020000044
10-AMA-88-54.0SOIL REMEDIATION AND REPLACE GENERATOR BUILDING.AMADOR COUNTY ABOUT 25 MILES NORTHEAST OF PIONEER AT PEDDLER HILL MAINTENANCE STATION10/05/20221 (05/17/2021)Details CEM-3701 Report
215643Project ID: 215643
DEA: 022J5504
EFIS: 0221000105
02-SHA,SHA&TEH-5,5,44,273,299-Various, variousStorm Water PreventionSha & Teh couties01/03/20221 (04/05/2021)Details CEM-3701 Report
215644Project ID: 215644
DEA: 061C1304
EFIS: 0621000101
06-KER,KER-204-5.61, 5.61/5.61, 5.61Bridge Scour Repair 03/02/20221 (04/05/2021)Details CEM-3701 Report
215645Project ID: 215645
DEA: 042W3304
EFIS: 0421000183
04-SON-128-16.8.16.9.17.56, 16.80, 16.90, 17.56Regrade slope, improve drainage, install underdrains, contour grading, clear/remove debris, remove loose rock on slop by hand scalling, rock slope protection, slope excavation & backfull, hydroseeding. 02/03/20231 (04/02/2021)Details CEM-3701 Report