Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14541-14550 of 17751 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993207 | Project ID: 993207 Permit Numbers: 04196SN2825 04206RT1409 04206RT2992 04216RT2271 04226RT0050 | 04---18.24 | Install two new traffic signals; one at the intersection of S. First Street and Chestnut Street and the other at the intersection of S. First Street and Valley Glen Drive; the S. First Street and Chestnut Street intersection include ADA ramp, crosswalk, drainage and asphalt updates on State Highway | S. First Street, Dixon | 10/14/2022 | 1 (10/22/2021) | Details CEM-3701 Report |
215636 | Project ID: 215636 DEA: 09385804 EFIS: 0920000046 | 09-KER-58-R129.4/R135.1,R143.2/R143.9 | COLD PLANE AC PAVEMENT AND PLACE HMA. | KERN COUNTY NEAR BORON FROM 0.3 MILE WEST OF EDWARDS AFB OVERCROSSING TO 1.3 MILES WEST OF TWENTY MULE TEAM OVERCROSSING AND FROM 0.7 MILE WEST OF SAN BERNARDINO COUNTY LINE TO SAN BERNARDINO COUNTY LINE | 08/31/2021 | 1 (06/23/2021) | Details CEM-3701 Report |
215637 | Project ID: 215637 DEA: 09387804 EFIS: 0921000002 | 09-INY-395-R6.4/R15.0,115.2/116.1 | COLD PLANE AC PAVEMENT AND PLACE HMA (TYPE A). | INYO COUNTY AT AND NEAR LITTLE LAKE FROM 6.6 MILES SOUTH TO 2.0 MILES NORTH OF CINDER ROAD AND IN BISHOP FROM SOUTH STREET TO MACIVER STREET | 08/30/2022 | 1 (06/23/2021) | Details CEM-3701 Report |
215638 | Project ID: 215638 DEA: 09387904 | 09-INY-190-111.6/126.1 | PLACE HMA OVER EXISTING PAVEMENT. | INYO COUNTY NEAR FURNACE CREEK FROM 0.1 MILE WEST OF BAD WATER ROAD TO 3.6 MILES EAST OF DANTE'S VIEW ROAD | 01/18/2022 | 1 (06/23/2021) | Details CEM-3701 Report |
215639 | Project ID: 215639 DEA: 100S6804 EFIS: 1014000100 | 10-ALP-4,88,89-Var | REPLACE CULVERTS, HEADWALLS AND REPLACE END TREATMENTS. | ALPINE COUNTY AT VARIOUS LOCATIONS | 1 (04/21/2021) | Details CEM-3701 Report | |
215640 | Project ID: 215640 DEA: 101F4304 EFIS: 1016000058 | 10-MER-140-35.9/36.9 | SLURRY SEAL AND CONSTRUCT CURB RAMPS. | MERCED COUNTY IN MERCED FROM ROUTE 99 NORTHBOUND OFF-RAMP TO KELLY AVENUE | 04/07/2022 | 1 (04/22/2021) | Details CEM-3701 Report |
215642 | Project ID: 215642 DEA: 101L6504 EFIS: 1020000044 | 10-AMA-88-54.0 | SOIL REMEDIATION AND REPLACE GENERATOR BUILDING. | AMADOR COUNTY ABOUT 25 MILES NORTHEAST OF PIONEER AT PEDDLER HILL MAINTENANCE STATION | 10/05/2022 | 1 (05/17/2021) | Details CEM-3701 Report |
215643 | Project ID: 215643 DEA: 022J5504 EFIS: 0221000105 | 02-SHA,SHA&TEH-5,5,44,273,299-Various, various | Storm Water Prevention | Sha & Teh couties | 01/03/2022 | 1 (04/05/2021) | Details CEM-3701 Report |
215644 | Project ID: 215644 DEA: 061C1304 EFIS: 0621000101 | 06-KER,KER-204-5.61, 5.61/5.61, 5.61 | Bridge Scour Repair | 03/02/2022 | 1 (04/05/2021) | Details CEM-3701 Report | |
215645 | Project ID: 215645 DEA: 042W3304 EFIS: 0421000183 | 04-SON-128-16.8.16.9.17.56, 16.80, 16.90, 17.56 | Regrade slope, improve drainage, install underdrains, contour grading, clear/remove debris, remove loose rock on slop by hand scalling, rock slope protection, slope excavation & backfull, hydroseeding. | 02/03/2023 | 1 (04/02/2021) | Details CEM-3701 Report |