Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14531-14540 of 17703 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215630 | Project ID: 215630 DEA: 061A5304 EFIS: 0620000052 | 06-FRE-198-26.3/26.8 | COLD PLANE PAVEMENT, RESURFACE WITH HMA AND MODIFY SIGNAL. | FRESNO COUNTY NEAR COALINGA FROM 0.5 MILE WEST OF ROUTE 5 TO ROUTE 198/5 SEPARATION | 03/02/2022 | 1 (03/29/2021) | Details CEM-3701 Report |
215632 | Project ID: 215632 DEA: 074W5104 EFIS: 0718000365 | 07-LA-405-0.8/47.8 | DECK REPAIR, CLEAN EXPANSION JOINTS, REPLACE JOINT SEAL. | IN LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF STERNS STREET UNDERCROSSING TO RINALDI STREET UNDERCROSSING | 07/03/2023 | 1 (08/17/2021) | Details CEM-3701 Report |
215633 | Project ID: 215633 DEA: 074W7904 EFIS: 0719000280 | 07-LA-5-14.2/R53.4 | PLACE METHACRYLATE AND REPAIR SPALLS ON BRIDGE DECK. | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM DOWNEY ROAD OVERCROSSING TO ROUTE 5/126 SEPARATION | 10/06/2022 | 1 (06/23/2021) | Details CEM-3701 Report |
215634 | Project ID: 215634 DEA: 074W8004 EFIS: 0719000298 | 07-VEN-33,101,118-Var | FURNISH AND PLACE POLYESTER CONCRETE OVERLAY ON BRIDGE DECK. | VENTURA COUNTY AT VARIOUS LOCATIONS | 12/01/2023 | 1 (08/02/2021) | Details CEM-3701 Report |
215635 | Project ID: 215635 DEA: 09385704 EFIS: 0920000045 | 09--- | Freeman II AR Chip Seal | 08/30/2022 | 1 (08/31/2021) | Details CEM-3701 Report | |
993207 | Project ID: 993207 Permit Numbers: 04196SN2825 04206RT1409 04206RT2992 04216RT2271 04226RT0050 | 04---18.24 | Install two new traffic signals; one at the intersection of S. First Street and Chestnut Street and the other at the intersection of S. First Street and Valley Glen Drive; the S. First Street and Chestnut Street intersection include ADA ramp, crosswalk, drainage and asphalt updates on State Highway | S. First Street, Dixon | 10/14/2022 | 1 (10/22/2021) | Details CEM-3701 Report |
215636 | Project ID: 215636 DEA: 09385804 EFIS: 0920000046 | 09-KER-58-R129.4/R135.1,R143.2/R143.9 | COLD PLANE AC PAVEMENT AND PLACE HMA. | KERN COUNTY NEAR BORON FROM 0.3 MILE WEST OF EDWARDS AFB OVERCROSSING TO 1.3 MILES WEST OF TWENTY MULE TEAM OVERCROSSING AND FROM 0.7 MILE WEST OF SAN BERNARDINO COUNTY LINE TO SAN BERNARDINO COUNTY LINE | 08/31/2021 | 1 (06/23/2021) | Details CEM-3701 Report |
215637 | Project ID: 215637 DEA: 09387804 EFIS: 0921000002 | 09-INY-395-R6.4/R15.0,115.2/116.1 | COLD PLANE AC PAVEMENT AND PLACE HMA (TYPE A). | INYO COUNTY AT AND NEAR LITTLE LAKE FROM 6.6 MILES SOUTH TO 2.0 MILES NORTH OF CINDER ROAD AND IN BISHOP FROM SOUTH STREET TO MACIVER STREET | 08/30/2022 | 1 (06/23/2021) | Details CEM-3701 Report |
215638 | Project ID: 215638 DEA: 09387904 | 09-INY-190-111.6/126.1 | PLACE HMA OVER EXISTING PAVEMENT. | INYO COUNTY NEAR FURNACE CREEK FROM 0.1 MILE WEST OF BAD WATER ROAD TO 3.6 MILES EAST OF DANTE'S VIEW ROAD | 01/18/2022 | 1 (06/23/2021) | Details CEM-3701 Report |
215639 | Project ID: 215639 DEA: 100S6804 EFIS: 1014000100 | 10-ALP-4,88,89-Var | REPLACE CULVERTS, HEADWALLS AND REPLACE END TREATMENTS. | ALPINE COUNTY AT VARIOUS LOCATIONS | 1 (04/21/2021) | Details CEM-3701 Report |