Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14511-14520 of 17605 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
215735 | Project ID: 215735 DEA: 05465804 EFIS: 0500020105 | 05-SCR-1- | 9 Intersection Improvements | 2 (05/17/2021) | Details CEM-3701 Report | ||
215736 | Project ID: 215736 Permit Numbers: 0421NOP1235 04216RW3141 04216RW3188 0421NUR0852 | 04-SM-82-0.3 | PROVIDE NEW SD SYSTEM, SEWER MAIN, ELECTRICAL LJNES AND UPSIZE WATER MAIN. NEW SIDEWALK WITH CURB RAMPS AND TRAFFIC SIGNAL IMPROVEMENTS. | 500 EL CAMINO REAL, Menlo Park | 01/31/2023 | 1 (11/15/2021) | Details CEM-3701 Report |
215737 | Project ID: 215737 Permit Numbers: 0418NOP1441 0420NRT2951 0420NRT2952 | 04---11.2/15.5 | The project proposes widening the inside median of SR4 in both directions from east of Milano Way/Glacier Drive to east of SR242.Widen State Route 4 from inside median in both direction from east of Milano/Glacier Drive to State Route 242, outside widening of State Route 4 of both directions from P | SR 4/680 Interchange and SR4 widening , Martinez and Concord | NOT VERIFIED | Details CEM-3701 Report | |
215738 | Project ID: 215738 DEA: 042Q8304 EFIS: 0419000056 COOP: 042803 | 04-ALA-680-4.8/5.0 | Improvements to the State Highway System | Sabercat Bridge and Trail connecting Ohlone College on the east side to future BART Station at Washington/Osgood and Blacow Road on the west, with a bicycle and pedestrian bridge over I-680 | 2 (09/07/2021) | Details CEM-3701 Report | |
215739 | Project ID: 215739 DEA: 010G2104 EFIS: 0116000137 | 01-DN-101-21.2 | CONSTRUCT RETAINING WALL AND GUARDRAIL AND EARTHWORK. | DEL NORTE COUNTY NEAR CRESCENT CITY AT 0.2 MILE NORTH OF CUSHING CREEK VIADUCT 01-0076 | 06/22/2023 | 1 (05/17/2021) | Details CEM-3701 Report |
215740 | Project ID: 215740 DEA: 010K5604 EFIS: 0120000117 | 01-MEN-101-79.0/81.5 | OVERLAY USING RHMA, HMA, AND REPLACING CONCRETE ASPHALT SURFACING. | MENDOCINO COUNTY NEAR TAN OAK PARK FROM 0.6 MILE NORTH OF SPYROCK ROAD TO 1.0 MILE SOUTH OF EMPIRE CAMP SAFETY ROADSIDE REST AREA | 10/27/2021 | 1 (05/17/2021) | Details CEM-3701 Report |
215741 | Project ID: 215741 DEA: 01366004 EFIS: 0100000127 | 01-HUM-101-80.0/84.0 | Indianola Cutoff UC | HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGE TO BAYSIDE CUTOFF | 1 (05/17/2021) | Details CEM-3701 Report | |
215742 | Project ID: 215742 DEA: 030J8804 EFIS: 0320000036 | 03-PLA-80-R56.9/R58.2 | RETROFIT ROCKFALL ATTENUATOR. | PLACER COUNTY NEAR EMIGRANT GAP FROM 0.8 MILE EAST TO 2.1 MILES EAST OF CARPENTER FLAT UNDERCROSSING | 01/18/2022 | 1 (05/20/2021) | Details CEM-3701 Report |
215743 | Project ID: 215743 DEA: 032H1104 EFIS: 0317000064 | 03-SAC-51-1.6/4.4 | ROADWAY EXCAVATION, PLACE HMA, SLOPE PAVING AND VEGETATION CONTROL | SACRAMENTO COUNTY IN SACRAMENTO FROM 0.1 MILE SOUTH OF B STREET UNDERPASS TO 0.4 MILE NORTH OF ARDEN WAY UNDERCROSSING | 07/26/2023 | 1 (05/20/2021) | Details CEM-3701 Report |
215744 | Project ID: 215744 DEA: 033H93U4 EFIS: 0321000091 | 03-YUB,BUT-70-25.5/25.8,0.0/3.8 | WIDEN ROADWAY & SHOULDER, ADD TURN LANES & CONSTRUCT BRIDGE. | YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD | 1 (05/20/2021) | Details CEM-3701 Report |