Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14501-14510 of 18295 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
213765 | Project ID: 213765 DEA: 081J1804 EFIS: 0817000221 | 08-RIV-10-R105.2/R135.1 | REPLACE ASPHALT CONCRETE SURFACING & UPGRADE TRAFFIC STRIPING | RIVERSIDE COUNTY FROM 0.1 MILE EAST OF ROUTE 177 TO 0.1 MILE EAST OF WILEY WELL OVERCROSSING | 06/23/2021 | 1 (02/06/2019) | Details CEM-3701 Report |
212911 | Project ID: 212911 DEA: 081F9404 EFIS: 0815000067 | 08-RIV-79-R4.7/R10.6 | COLD PLANE, OVERLAY WITH RUBBERIZED HOT MIX ASPHALT (TYPE G) | RIVERSIDE COUNTY FROM 0.1 MILE SOUTH OF MURRIETA HOT SPRINGS ROAD TO 0.1MILE NORTH OF ABELIA ROAD | 06/23/2021 | 1 (12/28/2018) | Details CEM-3701 Report |
212689 | Project ID: 212689 DEA: 081C0604 EFIS: 0812000256 | 08-RIV-10-44.4/51.7 | COLD PLANE AND OVERLAY RUBBERIZED HOT MIX ASPHALT (TYPE G) | RIVERSIDE COUNTY FROM 0.1 MILE WEST OF MONTEREY AVENUE OVERCROSSING TO 0.6 MILE WEST OF JEFFERSON STREET OVERCROSSING | 06/23/2021 | 1 (03/14/2018) | Details CEM-3701 Report |
211242 | Project ID: 211242 DEA: 081G0804 EFIS: 0815000123 | 08-RIV-10-R134.3/R144.1 | REHABILITATE PAVEMENT | RIVERSIDE COUNTY FROM 0.7 MILE WEST OF WILEY'S WELL ROAD TO 1.0 MILE WEST OF MESA DRIVE | 06/23/2021 | 1 (09/21/2016) | Details CEM-3701 Report |
994586 | Project ID: 994586 DEA: 081C08U4 EFIS: 0822000142 | 08-RIV-10-R134.0/R156.5 | PLACE HMA (TYPE A), JPCP, IMPORTED BORROW, ROADWAY EXCAVATION & CL2 AB | RIVERSIDE COUNTY FROM 1.1 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE | 1 (08/02/2023) | Details CEM-3701 Report | |
212576 | Project ID: 212576 DEA: 080R7804 EFIS: 0812000165 | 08-RIV-74-52.1/62.5,78.7/R92.0 | INSTALL MIDWEST GUARDRAIL SYSTEM (MGS) | RIVERSIDE COUNTY FROM 1.2 MILES WEST OF STRAWBERRY CREEK BRIDGE TO 0.2 MILE WEST OF APPLE CANYON ROAD AND FROM 0.7 MILE EAST OF RIBBONWOOD DRIVE TO 1.3 MILES WEST OF CAHUILLA WAY | 06/23/2021 | 1 (03/20/2018) | Details CEM-3701 Report |
214226 | Project ID: 214226 DEA: 081E6114 EFIS: 0818000175 | 08-RIV-62-81.6/82.2 | REPLACE AC SURFACING, PLACE RHMA-G AND HMA | RIVERSIDE COUNTY FROM 3.4 MILES TO 2.8 MILES WEST OF 177 | 06/23/2021 | 1 (03/06/2020) | Details CEM-3701 Report |
212989 | Project ID: 212989 DEA: 081C6204 | 08-RIV-111-0.0/10.5 | SEDIMENT STABILIZATION AND EROSION CONTROL | RIVERSIDE COUNTY FROM IMPERIAL COUNTY LINE TO 1.0 MILE EAST OF CLEVELAND STREET | 06/23/2021 | 1 (04/09/2018) | Details CEM-3701 Report |
212850 | Project ID: 212850 DEA: 081F8404 | 08-RIV-111-0.0/18.3;55.5/R63.3 | PLACE CENTERLINE AND SHOULDER RUMBLE STRIPS | RIVERSIDE COUNTY FROM IMPERIAL COUNTY LINE TO ROUTE 195 AND FROM 0.2 MILE NORTH OF WEST GATEWAY DRIVE TO ROUTE 10 | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
211433 | Project ID: 211433 DEA: 081G0604 EFIS: 0815000122 | 08-RIV-177-0.0/27.0 | LOCALIZED DIG-OUT AND PLACE ASPHALT RUBBER BINDER SEAL COAT | RIVERSIDE COUNTY FROM ROUTE 10 TO ROUTE 62 | 04/11/2017 | 1 (09/21/2016) | Details CEM-3701 Report |