Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14481-14490 of 18126 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
7448 | Project ID: 7448 DEA: 080N2604 EFIS: 0800000518 | 08-RIV-15-34.9/35.5 | INSTALL OUTER SEPARATION CONCRETE BARRIER | RIVERSIDE COUNTY NEAR CORONA FROM 1.4 MILES NORTH OF GLEN IVY UNDERCROSSING TO 0.1 MILE SOUTH OF WEIRICK ROAD UNDERCROSSING | 11/01/2012 | 1 (08/28/2012) | Details CEM-3701 Report |
211375 | Project ID: 211375 DEA: 081E3004 EFIS: 0813000207 | 08-RIV-15-33.1/35.8 | INSTALL RAMP METERING SYSTEM AT NB & SB ENTRANCE RAMPS | RIVERSIDE COUNTY NEAR CORONA FROM TEMESCAL CANYON ROAD TO WEIRICK ROAD | 10/16/2017 | 1 (10/26/2016) | Details CEM-3701 Report |
208732 | Project ID: 208732 DEA: 081C8304 EFIS: 0813000038 | 08-RIV-111-8.0/10.0 | COLD IN-PLACE RECYCLING AND COLD PLANE AND PAVE WITH HMA (TYPE C) | RIVERSIDE COUNTY NEAR DESERT BEACH AND NORTH SHORE FROM 0.3 MILE NORTH OF PARKSIDE DRIVE TO 1.6 MILES SOUTH OF CLEVELAND STREET | 01/09/2014 | 1 (06/19/2013) | Details CEM-3701 Report |
1000027 | Project ID: 1000027 DEA: 081J7104 EFIS: 0818000098 | 08-RIV-10-R91.9 | STRUCTURE EXCAVATION, PARTIALLY GROUTED RSP, AND RHMA. | RIVERSIDE COUNTY NEAR DESERT CENTER AT ORRIS DITCH BRIDGE | 1 (01/18/2024) | Details CEM-3701 Report | |
5008 | Project ID: 5008 DEA: 080K6814 | 08-RIV-10-94.7/99.0 | BRIDGE REHABILITATION | RIVERSIDE COUNTY NEAR DESERT CENTER AT VARIOUS LOCATIONS FROM 5.2 MILES EAST OF HAYFIELD ROAD TO 3.0 MILES WEST OF EAGLE MOUNTAIN ROAD | 06/08/2012 | 1 (06/08/2012) | Details CEM-3701 Report |
993649 | Project ID: 993649 DEA: 081M0304 EFIS: 0821000062 | 08-RIV-177-0.0/27.0 | PLACE RUBBERIZED HMA, TRAFFIC STRIPING & COLD PLANE ASPHALT CONCRETE. | RIVERSIDE COUNTY NEAR DESERT CENTER FROM ROUTE 10/177 SEPARATION TO ROUTE 62 | 03/27/2023 | 1 (07/27/2022) | Details CEM-3701 Report |
8128 | Project ID: 8128 DEA: 080N9104 EFIS: 0800001013 | 08-RIV-62-R0.4/R1.1 | INSTALL TRAFFIC SIGNAL AND REALIGN TWO LEFT TURN LANES. | RIVERSIDE COUNTY NEAR DESERT HOT SPRINGS FROM 1.1 MILE NORTH TO 0.8 MILE SOUTH OF DILLON ROAD | 12/23/2013 | 1 (12/10/2012) | Details CEM-3701 Report |
208908 | Project ID: 208908 DEA: 08491804 EFIS: 0800020104 | 08-RIV-62-0.0/R6.7 | REHABILITATE ROADWAY PAVEMENT AND WIDEN MEDIAN SHOULDERS | RIVERSIDE COUNTY NEAR DESERT HOT SPRINGS FROM ROUTE 10/62 SEPARATION TO NORTH INDIAN CANYON DRIVE | 10/08/2014 | 1 (10/01/2013) | Details CEM-3701 Report |
213808 | Project ID: 213808 DEA: 080N6704 EFIS: 0800000536 | 08-RIV-74-28.1/37.4 | CONSTRUCT RAISED MEDIAN AND LEFT TURN LANES. | RIVERSIDE COUNTY NEAR HEMET FROM 0.6 MILE EAST OF ROUTE 215 TO 0.4 MILE WEST OF ACACIA AVENUE. | 04/28/2022 | 1 (12/04/2019) | Details CEM-3701 Report |
215803 | Project ID: 215803 DEA: 081J0204 EFIS: 0817000182 | 08-RIV-74-R48.8/49.2 | CONSTRUCT DRAINAGE SYSTEM WITH STRUCTURAL CONCRETE HEADWALL AND CSP. | RIVERSIDE COUNTY NEAR HEMET FROM 0.7 MILE TO 1.1 MILES EAST OF BLACKBURN ROAD | 07/27/2023 | 1 (06/23/2021) | Details CEM-3701 Report |