Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14471-14480 of 18023 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
212114 | Project ID: 212114 DEA: 044K4604 EFIS: 0417000312 | 04-SM-1-17.0/17.5 | construct soldier pile wall and RSP | ROUTE 1, AT POSTMILE 17.0 TO 17.5, NEAR THE JUNCTION OF HWY 84, SAN MATEO COUNTY REPAIR SLOPE | 08/22/2018 | 1 (06/30/2017) | Details CEM-3701 Report |
212354 | Project ID: 212354 DEA: 044K8504 EFIS: 0417000378 | 04-MRN,MTRN-1-22.8, 22.80 | Giacomini Creek Bridge, Construct sheet pile wall, replace culvert | ROUTE 1, AT POSTMILE 22.8, NEAR BOLINAS, AT 0.52 MILES NORTH OF HORSESHOE HILL RD., MARIN COUNTY SLIPOUT, CONSTRUCT SOLDIER PILE WALL | 12/16/2021 | 1 (05/01/2017) | Details CEM-3701 Report |
209307 | Project ID: 209307 Permit Numbers: 0713NSN1378 07146DP2450 07146DP2370 0714NRT2448 | 07-LA-10-23.339/23.339 | Modify traffic signal and lighting, including siganage and video detection.DP is 714-6DP-2370 | Route 10 (San Bernardino Freeway), Monterey Park | 07/31/2018 | 1 (03/05/2014) | Details CEM-3701 Report |
3746 | Project ID: 3746 EFIS: 0000001155 Permit Numbers: 0710NSN0979 | 07-LA-10-9.34/9.34 | Install protected left turn phasing for NB Fairfax Ave. and install audible pedestrian signal for all 4 crosswalks. | Route 10 Fwy, Los Angeles | 07/31/2018 | 1 (12/13/2012) | Details CEM-3701 Report |
3741 | Project ID: 3741 EFIS: 0000001155 Permit Numbers: 0710NSN0633 | 07-LA-10-7.24/7.24 | Upgrade traffic signal intersection to install protected left turn phasing for northbound National Blvd. | Route 10 WB Ramps, Los Angeles | 08/03/2011 | 1 (12/26/2012) | Details CEM-3701 Report |
213707 | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 | 08-RIV-10-6.7/R25.1 | Remove concrete pavement and base, and place HMA and JPCP | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. | 11/01/2023 | 1 (01/09/2020) | Details CEM-3701 Report |
211130 | Project ID: 211130 DEA: 074X8004 | 07-VEN-101,1-32.2/34.8,21.5/23.3, VAR | Repair fire damage and protect highways from fire debris flow from Solimar Fire | Route 101 and Route 1 from 0.7 mile north of West Main St Undercrossing to 0.1 mile s=north of Dulah Road Undercrossing | 07/05/2017 | NOT VERIFIED | Details CEM-3701 Report |
994782 | Project ID: 994782 DEA: 041Y2204 EFIS: 0422000448 MINOR: 04A6682 | 04-SM-101,280- | Replace 2 CMS on Route 101 | Route 101 at 0.2 Mile South of Lagoon Road and On Route 280 at 0.3 Mile South of Hickey Blvd. | 1 (05/09/2023) | Details CEM-3701 Report | |
49 | Project ID: 49 DEA: 01324704 | 01-DN-101-15.0/15.4 | CONSTRUCT RETAINING WALLS | Route 101 Del Norte County 10.5 miles north of Klamath | 11/10/2010 | 1 (07/23/2009) | Details CEM-3701 Report |
264 | Project ID: 264 DEA: 01481704 | 01-DN-101-14.4/14.8 | RECONSTRUCT ROADWAY AND PLACE OPEN GRADED FRICTION COURSE | Route 101 Del Norte County 11 miles south of crescent city | 03/23/2010 | 1 (03/23/2010) | Details CEM-3701 Report |