Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14341-14350 of 17322 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
995310Project ID: 995310
DEA: 120U3904
EFIS: 1223000076
12-ORA-57-15.4/15.5Remvoe and replace concrete median barrier  1 (11/21/2023)Details CEM-3701 Report
995311Project ID: 995311
DEA: 101R2004
EFIS: 1023000112
10-SJ-4-36.7/36.7Repair 36\\" culvert, embankment 02/26/20241 (11/16/2023)Details CEM-3701 Report
995312Project ID: 995312
DEA: 072XC704
EFIS: 0723000086
07-VEN-126-26.48/26.48Remove debris from pavement, railroad tracks and from under bridge  1 (11/27/2023)Details CEM-3701 Report
995313Project ID: 995313
DEA: 010M7504
EFIS: 0123000065
01-HUM-101-51/90.5Repair bridge components, approach slabs 04/22/20241 (11/16/2023)Details CEM-3701 Report
995314Project ID: 995314
DEA: 072XC904
EFIS: 0723000088
07-LA-5-R63.43/R65.97, R63.43/R68.5Remove debris, rebuild slope, pavement, drainage ditch 04/24/20241 (01/22/2024)Details CEM-3701 Report
995315Project ID: 995315
DEA: 042Y8604
EFIS: 0423000167
04-ALA-580-26.2/26.2Place Krail and remove material from road and slope  1 (11/27/2023)Details CEM-3701 Report
995316Project ID: 995316
DEA: 061F0504
EFIS: 0623000132
06-FRE-168-L28.78/L31.78Scale slope and remove debris 05/16/20241 (11/13/2023)Details CEM-3701 Report
995317Project ID: 995317
DEA: 020K1504
EFIS: 0223000116
02-BUT,PLU-70-22/43Provide Traffic control 24/7, removed slide material from slope and travel way, monitor the corridor for rock fall and mud slides.  1 (04/02/2024)Details CEM-3701 Report
995318Project ID: 995318
DEA: 034J1704
EFIS: 0323000126
03-PLA-80-24/26Replace failed culverts, repair sinkhole, repair failed pavement, and restore eroded slope.  1 (11/13/2023)Details CEM-3701 Report
995319Project ID: 995319
DEA: 061F6704
EFIS: 0623000140
06-FRE-168-49/52, 39.5/5224-hour traffic control, grind and replacement of damage roadway surface, traffic stripe replacement, lighr plants, erosion control, grind and repair 0.25 feet of HMA failed pavement, remove and replace unsuitable material, CMS boards, install temporary K-Rail, and repair existing drainage systems 05/16/20241 (11/13/2023)Details CEM-3701 Report