Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14341-14350 of 17751 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
215562Project ID: 215562
DEA: 101J3604
EFIS: 1018000228
10-CAL-49-8.6  03/22/20231 (03/26/2021)Details CEM-3701 Report
215563Project ID: 215563
Permit Numbers: 10196MC0162
10---30.828To widen Beckman Road by adding a continuous left turn lane.SR 99, Lodi 2 (05/10/2023)Details CEM-3701 Report
215564Project ID: 215564
Permit Numbers: 0717NMC2695 0720NRT2438 0720NRT3058 0721NRW0001 0721NRW1213
07---2.9/3.1Install traffic striping and legends (includes green bike lane striping), bike signals, traffic signal, controller cabinets, loop detectors, roadside signs, landscape and irrigation, hardscape, and RCP; construct sidewalks, curb ramps, driveway, retaining walls, drainage inlets, and bicycle pad; coVEN 101, Thousand Oaks10/06/20221 (03/25/2021)Details CEM-3701 Report
215565Project ID: 215565
Permit Numbers: 0320AOP1078
03-ED-50-16.4/16.8The WPI Phase 2.2 Project will construct the east bound on-ramp from Ray Lawyer Drive onto US 50 within the city of PlacervilleN/A, Placerville 2 (04/19/2021)Details CEM-3701 Report
215566Project ID: 215566
DEA: 061A8504
EFIS: 0620000084
MINOR: 06A2646
06-FRE-180,41-R58.4/R58.6,R24.5/R24.8  07/27/20231 (03/15/2021)Details CEM-3701 Report
215567Project ID: 215567
DEA: 081L3503
EFIS: 0820000060
COOP: 081712
08-SBD-83-2.4/2.9The project is a Caltrans widening along SR-83 in the City of Chino. The project proposes to construct right-turn lanes, a right in/right-out driveway, and a full access driveway leading to the proposed Euclid Commerce Center.The project limits are along SR-83 between Kimball Avenue and Bickmore Avenue between PM 2.4 and PM 2.9 in the City of Chino. 2 (03/05/2021)Details CEM-3701 Report
215568Project ID: 215568
DEA: 044H4404
EFIS: 0413000251
04-CC-4-33.4/0The overcrossing will include a multi-span bridge with a column in the Highway 4 median. Bridge approaches will be constructed on earthen embankments. The path will range from 12 to 16 feet in width.The Mokelumne Trail Bicycle/Pedestrian Overcrossing project will construct a pedestrian and bicycle bridge that spans Highway 4 – closing a gap along the Mokelumne Trail, and providing safe access for bicyclists and pedestrians. 2 (03/11/2021)Details CEM-3701 Report
215569Project ID: 215569
DEA: 060Y9804
EFIS: 0619000101
MINOR: 06A2626
06--Var-VarTMS DETECTION REPAIR 08/31/20231 (03/15/2021)Details CEM-3701 Report
215570Project ID: 215570
DEA: 032G0004
EFIS: 0320000141
03-NEV-49-30.0/32.1INSTALL CURED-IN-PLACE PIPELINERS.NEVADA COUNTY NEAR NORTH SAN JUAN AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF OAK TREE ROAD TO 0.6 MILE SOUTH OF MIDDLE YUBA RIVER BRIDGE01/20/20221 (03/22/2021)Details CEM-3701 Report
215571Project ID: 215571
DEA: 032G0904
EFIS: 0320000228
03-ED-49-16.5/23.6MICRO-SURFACING.EL DORADO COUNTY NEAR PLACERVILLE FROM DIANA STREET TO 0.3 MILE EAST OF LOTUS ROAD07/22/20211 (03/22/2021)Details CEM-3701 Report