Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14281-14290 of 17829 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
5033 | Project ID: 5033 DEA: 080L2404 | 08-RIV-79-0.0/15.6 | INSTALL CENTERLINE RUMBLE STRIP | RIVERSIDE COUNTY NEAR TEMECULA FROM SAN DIEGO COUNTY LINE TO 1.1 MILES WEST OF ANZA ROAD | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
4993 | Project ID: 4993 DEA: 080K3004 | 08-RIV-15-R0.5/R2.6 | REPLACE PCC PAVEMENT AND GRIND EXISTING CONCRETE PAVEMENT | RIVERSIDE COUNTY NEAR THE CITY OF TEMECULA FROM 0.5 MILE NORTH OF SAN DIEGO COUNTY LINE TO 0.4 MILE SOUTH OF TEMECULA RIVER BRIDGE | 06/08/2012 | 1 (06/08/2012) | Details CEM-3701 Report |
208600 | Project ID: 208600 DEA: 080Q1104 EFIS: 0800020211 | 08-RIV-10-44.7/50.3 | CONSTRUCT CONCRETE BARRIER, WIDEN OUTSIDE SHOULDER, AND HYDROSEED. | RIVERSIDE COUNTY NEAR THOUSAND PALMS FROM 0.1 MILE EAST OF MONTEREY AVENUE OVERCROSSING TO 0.2 MILE WEST OF WASHINGTON STREET OVERCROSSING | 05/29/2014 | 1 (07/24/2013) | Details CEM-3701 Report |
211965 | Project ID: 211965 DEA: 081F9504 | 08-RIV-10-29.6 | INSTALL HIGH FRICTION SURFACE TREATMENT. | RIVERSIDE COUNTY NEAR WHITEWATER AT WESTBOUND ROUTE 62 TO EASTBOUND ROUTE 10 CONNECTOR | 07/31/2018 | 1 (07/31/2018) | Details CEM-3701 Report |
5051 | Project ID: 5051 DEA: 080L5904 EFIS: 0800000421 | 08-RIV-10-R135.0,R144.3 | REPLACE SEWER SYSTEM AND WATER SUPPLY SYSTEM. | RIVERSIDE COUNTY ON ROUTE 10 ABOUT 17.5 MILES WEST OF BLYTHE AT WILEY WELL SAFETY ROADSIDE REST AREA AND ABOUT 8.2 MILES WEST OF BLYTHE AT BLYTHE WEIGH STATION AND IN SACRAMENTO COUNTY IN | 07/13/2016 | 1 (05/25/2010) | Details CEM-3701 Report |
212068 | Project ID: 212068 DEA: 081G3904 | 08-RIV-10-R20.1/R99.1 | BRIDGE MAINTENANCE WITH METHACRYLATE AND POLYESTER OVERLAY | RIVERSIDE COUNTY ON ROUTE 10 FROM MILLARD CANYON BRIDGE TO TARO DITCH BRIDGE | 08/16/2023 | 1 (01/15/2019) | Details CEM-3701 Report |
993534 | Project ID: 993534 DEA: 081K5104 EFIS: 0819000054 | 08-RIV-15,215-28.9,R9.7 | CULVERT CONTACT GROUTING, CONCRETE INVERT PAVING & MISC. IRON & STEEL. | RIVERSIDE COUNTY ON ROUTE 15 AT 0.1 MILE NORTH OF HORSETHIEF CANYON ROAD UNDERCROSSING AND ON ROUTE 215 AT 0.2 MILE NORTH OF MURRIETA HOT SPRINGS ROAD OVERCROSSING | 11/01/2022 | 1 (02/21/2022) | Details CEM-3701 Report |
993628 | Project ID: 993628 DEA: 081M0504 EFIS: 0821000064 | 08-RIV-15,215-23.9/33.4,R8.4/41.5 | COLD PLANE AC PVMT, RHMA, AND REPLACE ASPHALT CONCRETE SURFACING. | RIVERSIDE COUNTY ON ROUTE 15 FROM 0.1 MILE NORTH OF NICHOLS ROAD OVERCROSSING TO 0.1 MILE NORTH OF TEMESCAL CANYON ROAD UNDERCROSSING AND ON ROUTE 215 FROM 1.1 MILES SOUTH OF MURRIETA HOT SPRINGS ROAD UNDERCROSSING TO UNIVERSITY AVENUE UNDERCROSSING. | 02/24/2023 | 1 (02/24/2023) | Details CEM-3701 Report |
208786 | Project ID: 208786 DEA: 080Q8504 EFIS: 0800020560 | 08-RIV-15-31.9/52.3 | BRIDGE REHABILITATION | RIVERSIDE COUNTY ON ROUTE 15 FROM TEMESCAL CANYON ROAD UNDERCROSSING TO PHILADELPHIA STREET UNDERCROSSING | 06/24/2014 | 1 (09/13/2013) | Details CEM-3701 Report |
209362 | Project ID: 209362 DEA: 083348V4 EFIS: 0812000258 | 08-RIV-215,60-37.36/38.49,12.2/14.0 | THIS IS A LANDSCAPE REPLACEMENT PLAN FOR THE I-215 CORRIDOR PROJECT. | RIVERSIDE COUNTY ON ROUTE 215 FROM 0.2 MILE SOUTH OF BOX SPRINGS ROAD OVERCROSSING TO EUCALYPTUS AVENUE OVERCROSSING AND ON ROUTE 60 FROM 0.2 MILE EAST OF BOX SPRINGS ROAD OVERCROSSING TO 0.3 MILES EAST OF DAY STREET UNDERCROSSING | 06/23/2021 | 1 (04/16/2014) | Details CEM-3701 Report |