Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13911-13920 of 17291 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
215125Project ID: 215125
DEA: 040AC804
EFIS: 0042222297
04-Various-Var-VarALT POWER SOURCE TRFFC CNTRL & DETOURMARIN, NAPA, SAN FRANCISCO, SAN MATEO, AND SONOMA12/16/20211 (08/21/2020)Details CEM-3701 Report
215126Project ID: 215126
DEA: 010G33U4
EFIS: 0120000002
01-LAK-20-5.1/6.3Widen shoulders and replace bridge with box culvert.LAKE COUNTY NEAR UPPER LAKE FROM 0.4 MILE WEST OF WITTER SPRINGS ROAD TO 0.4 MILE EAST OF BACHELOR CREEK BRIDGE10/07/20221 (08/26/2020)Details CEM-3701 Report
215127Project ID: 215127
DEA: 024G5304
EFIS: 0214000023
02-LAS,SHA,TEH-5,32,36,44,299-VARDITCH EXCAVATION, DEVELOP TEMP CREEK DIVERSION SYSTEM, AND PLACE RSP. DISTRICT WIDE SCOUR COUNTER-MEASURES.LASSEN, SHASTA, AND TEHAMA COUNTIES AT VARIOUS LOCATIONS07/27/20231 (08/26/2020)Details CEM-3701 Report
215128Project ID: 215128
DEA: 080275U4
08---  08/17/2021NOT VERIFIEDDetails CEM-3701 Report
215129Project ID: 215129
DEA: 050N73U4
EFIS: 0520000166
05-SB-101-7.3/9.6!!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar,SUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE 1 (08/24/2020)Details CEM-3701 Report
215130Project ID: 215130
DEA: 043Q2104
EFIS: 0419000188
04-SCL-VAR,880-0REPAIR/REPLACE CROSSWALK & STRIPING  1 (10/19/2020)Details CEM-3701 Report
215131Project ID: 215131
Permit Numbers: 04206MC1864 04216RT0415
04-SCL-82-17.3Remove and replace curb and gutter sidewalk existing bus pad and shelter.833 West El Camino Real, Sunnyvale03/27/20231 (09/02/2020)Details CEM-3701 Report
215132Project ID: 215132
DEA: 051M6404
EFIS: 0520000045
05-SLO-101-37/46, 37.0-46.0Atascadero Slab Replacement - replace JPCP with precast pavement panels (Procast)US 101 near Atascadero08/23/20211 (08/26/2020)Details CEM-3701 Report
215133Project ID: 215133
Permit Numbers: 08196CD0251 08216RW0161 08216RW0179 08216RW0342 08216RW0693 08216RT0871
08---2.9/-1Enter onto SR-83 right-of-way at Kimball Avenue in the City of Chino, to perform street improvement, signal modification, signal pole relocation, install curb, gutter, sidewalk and a modified commercial driveway approach, as per plans and SWPPP date stamped August 07, 2020 by the Department of Tran7031 Kimball Avenue, Chino10/27/20211 (07/14/2021)Details CEM-3701 Report
215135Project ID: 215135
DEA: 061A8304
EFIS: 0620000082
MINOR: 06A2629
06---  07/27/20231 (09/09/2020)Details CEM-3701 Report