Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13771-13780 of 17322 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
4858 | Project ID: 4858 DEA: 080E5704 | 08-SBd-66,259,330-VAR | REPLACE METAL BEAM GUARD RAILING AND TERMINAL SYSTEMS | 12/20/2010 | 1 (12/20/2010) | Details CEM-3701 Report | |
4859 | Project ID: 4859 DEA: 080E5804 | 08-SBd-30-R31.2 | BRIDGE DEC JOINTS TO BE REBUILT | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
4860 | Project ID: 4860 DEA: 080E6104 | 08-SBd-18-46.9 | INSTALL CHANGEABLE MESSAGE SIGN SYSTEM | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
4861 | Project ID: 4861 DEA: 080E6804 | 08-RIV-15,91-41.5/6.9 | BRIDGE DECK REHABILITATION | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
4862 | Project ID: 4862 DEA: 080E7304 | 08-SBd-10-R53.9/48.6 | REHABILITATE BRIDGE DECKS | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
4865 | Project ID: 4865 DEA: 080E8804 MINOR: 08A1238 | 08-RIV-10-11.2/11.8 | INSTALL MBGR | 2 (06/23/2021) | Details CEM-3701 Report | ||
4868 | Project ID: 4868 DEA: 080E9904 | 08-SBd-10-17.6 | DRAINAGE CHANNEL REPAIR,REMOVE AND REPLACE CHAIN LINK FENCE AND MBGR | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
4873 | Project ID: 4873 DEA: 080F1404 | 08-SBd-30-R43.3/R48.7 | INSTALL THRIE BEAM BARRIER | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
4876 | Project ID: 4876 DEA: 080F1804 | 08-SBd-40-35.1 | CHANNEL TO BE REGRADED, WORK TO INCLUDE ROCK SLOPE PROTECTION | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
4877 | Project ID: 4877 DEA: 080F1904 EFIS: 0800000118 | 08-RIV-10-R15.7 | UPGRADE ELECTRICAL SYSTEM , INSTALL STNBY GENERATOR AND LPG TANKS | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report |