Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13771-13780 of 17307 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
5120 | Project ID: 5120 DEA: 080N3004 | 08-RIV-60-13.3/30.4 | Digouts, Cold Plane and Overlay with RHMA (Type O) | RIVERSIDE COUNTY IN MORENO VALLEY AND BEAUMONT FROM DAY STREET UNDERCROSSING TO ROUTE 10/60 SEPARATION | 10/28/2011 | 1 (10/28/2011) | Details CEM-3701 Report |
5031 | Project ID: 5031 DEA: 080L2104 | 08-RIV-60-19.1,20.4 | Replace AC surfacing, repair deck, place polyester concrete overlay | RIVERSIDE COUNTY IN MORENO VALLEY AT MORENO BEACH DRIVE OVERCROSSING AND AT REDLANDS BOULEVARD OVERCROSSING | 12/20/2010 | 1 (12/20/2010) | Details CEM-3701 Report |
214108 | Project ID: 214108 DEA: 081H1404 EFIS: 0816000162 | 08-RIV-60-16.6 | CONSTRUCT TRAFFIC SIGNAL. | RIVERSIDE COUNTY IN MORENO VALLEY AT SUNNYMEAD BOULEVARD EASTBOUND ENTRANCE RAMP | 09/03/2020 | 1 (12/23/2019) | Details CEM-3701 Report |
995180 | Project ID: 995180 DEA: 081J6804 EFIS: 0818000094 | 08-RIV-60-13.3/18.4 | MODIFYING SIGNAL & LIGHTING SYSTEMS, LIGHTING SYSTEMS & MINOR CONC. | RIVERSIDE COUNTY IN MORENO VALLEY AT VARIOUS LOCATIONS FROM DAY STREET UNDERCROSSING TO NASON STREET OVERCROSSING | 1 (10/09/2023) | Details CEM-3701 Report | |
5267 | Project ID: 5267 DEA: 08449314 EFIS: 0800000715 | 08-RIV-60,215-R19.7/21.9,R61.3/62.7 | ADD HOV LANE IN EACH DIRECTION AND REPLACE STRUCTURES. | RIVERSIDE COUNTY IN MORENO VALLEY ON ROUTE 215 FROM 0.9 KM NORTH OF EUCALYPTUS AVENUE UNDERCROSSING TO 0.5 KM WEST OF BOX SPRINGS ROAD OVERCROSSING AND ON ROUTE 60 FROM 60/215 SEPARATION TO 0.4 KM EAST OF DAY STREET OVERCROSSING | 04/03/2015 | 1 (04/13/2011) | Details CEM-3701 Report |
213416 | Project ID: 213416 DEA: 081C1604 | 08-RIV-60,215-R38.3/38.9,12.1/21.5 | INSTALL ROCK BLANKET AND IMPROVE IRRIGATION SYSTEM. | RIVERSIDE COUNTY IN MORENO VALLEY ON ROUTE 60 FROM 215/60 SEPARATION TO THEODORE STREET AND ON ROUTE 215 FROM 0.3 MILE NORTH OF BOX SPRINGS ROAD TO 0.6 MILE SOUTH OF BOX SPRINGS ROAD | 06/23/2021 | 1 (12/31/2018) | Details CEM-3701 Report |
995060 | Project ID: 995060 DEA: 081J2604 EFIS: 0818000012 | 08-RIV-215-R13.5/R19.5 | RHMA, REPLACE AC SURFACING, ROCK BLANKET, AND COMPOST. | RIVERSIDE COUNTY IN MURRIETA AND MENIFEE FROM 1.0 MILE NORTH OF CLINTON KEITH ROAD TO 1.0 MILE NORTH OF NEWPORT ROAD | 1 (08/15/2023) | Details CEM-3701 Report | |
994591 | Project ID: 994591 DEA: 081J6704 EFIS: 0818000090 | 08-RIV-15-9.4/16.3 | MINOR CONCRETE, MODIFYING SIGNAL AND LIGHTING SYSTEMS, HMA AND JPCP. | RIVERSIDE COUNTY IN MURRIETA AND WILDOMAR AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF MURRIETA HOT SPRINGS ROAD OVERCROSSING TO BUNDY CANYON ROAD UNDERCROSSING. | 1 (06/20/2023) | Details CEM-3701 Report | |
994587 | Project ID: 994587 DEA: 081G8904 EFIS: 0816000099 | 08-RIV-15-8.2/13.9 | STAMPED CONCRETE, ROCK BLANKET, MGS, AND VEGETATION CONTROL. | RIVERSIDE COUNTY IN MURRIETA AND WILDOMAR FROM 0.5 MILE SOUTH OF ROUTE 15/215 SEPARATION TO 0.3 MILE NORTH OF CLINTON KEITH ROAD | 1 (07/28/2023) | Details CEM-3701 Report | |
213816 | Project ID: 213816 DEA: 081G8704 EFIS: 0816000094 | 08-RIV-215-R12.7-R15.0 | PLACE MIDWEST GUARDRAIL SYSTEM ON ROUTE NB 215 | RIVERSIDE COUNTY IN MURRIETA FROM 0.2 MILES NORTH OF CLINTON KEITH ROAD OVERCROSSING TO 0.5 MILES SOUTH OF SCOTT ROAD OVERCROSSING | 09/30/2019 | 1 (09/30/2019) | Details CEM-3701 Report |