Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 111-120 of 17926 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993118 | Project ID: 993118 DEA: 101C3304 EFIS: 1014000146 | 10-SJ-205-R4.6/R9.0 | Widening bridges, ramps and roadway. SR205 SMART CORRIDOR - PHASE 2 | On state highway in San Joaquin County in and near Tracy from Janney Overhead to 1.3 miles east of MacArthur Drive Overcrossing. | 1 (07/06/2022) | Details CEM-3701 Report | |
210886 | Project ID: 210886 DEA: 050F7004 EFIS: 0500000049 | 05-MON-68-R17.4/R18.0 | WIDENING BRIDGE | IN MONTEREY COUNTY ON ROUTE 68 NEARSALINAS FROM 0.2 MILE EAST OFRESERVATION ROAD UNDERCROSSING TO SPRECKELS BOULEVARD UNDERCROSSING | 12/30/2019 | 1 (02/01/2016) | Details CEM-3701 Report |
725 | Project ID: 725 Permit Numbers: 03036MC0298 | 03-ED-50-15.06/-1 | Widening and signal modifications | N/A, N/A | 09/16/2014 | 2 (09/15/2014) | Details CEM-3701 Report |
210463 | Project ID: 210463 DEA: 044H1704 EFIS: 0413000127 COOP: 042468 Permit Numbers: 0417NOP0291 | 04-ALA-84-R3.3/R9.0 | Widening and replacing the existing bridge | Marshlands Road ( old state Hwy 84 Dumbarton Bridge Toll Road) | 04/24/2019 | NOT VERIFIED | Details CEM-3701 Report |
2048 | Project ID: 2048 DEA: 04249044 | 04-ALA-238-23.2/49.6 | WIDENING AND REHABILITATE | IN ALAMEDA COUNTY IN AND NEAR HAYWARD AND SAN LEANDRO AT VARIOUS LOCATIONS | 06/08/2011 | 1 (05/29/2008) | Details CEM-3701 Report |
6032 | Project ID: 6032 DEA: 11231504 EFIS: 1100000151 | 11-SD-76,78-R28.0/30.1 | WIDENING AND REALIGNMENT OF SR -76 & I-15 @ RTE 76 | 08/17/2021 | 2 (07/09/2021) | Details CEM-3701 Report | |
10017 | Project ID: 10017 DEA: 06430704 EFIS: 0600000425 | 06-TUL-216-1.9/2.9 | WIDENING AND REALIGNMENT OF ROUTE 216. | TULARE COUNTY IN AND NEAR VISALIA FROM LOVERS LANE TO 0.1 MILE EAST OF COMSTOCK STREET | 07/30/2015 | 1 (09/26/2013) | Details CEM-3701 Report |
5550 | Project ID: 5550 DEA: 100E6124 EFIS: 1000020441 | 10-SJ-99-10.6/14.9 | WIDENING AND OVERLAY EXISTING ROADWAY | IN AND NEAR STOCKTON FROM 0.8 MILE SOUTH OF FRENCH CAMP ROAD UNDERCROSSING TO 0.3 MILE NORTH OF ARCH ROAD UNDERCROSSING | 01/24/2018 | 1 (07/24/2012) | Details CEM-3701 Report |
210040 | Project ID: 210040 DEA: 04297624 EFIS: 0400020581 COOP: 042558 | 04-ALA-84-22.9/25.7 | WIDENING AND EXPRESSWAY UPGRADES | ON ROUTE 84, FROM RUBY HILL DRIVE TO NORTH OF CONCANNON BOULEVARD | 03/12/2020 | 1 (11/10/2015) | Details CEM-3701 Report |
931 | Project ID: 931 DEA: 031E3604 | 03-SAC-16-7.9/9.2 | Widening and construct a two-way left turn lane. | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report |