Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11981-11990 of 17328 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1000059 | Project ID: 1000059 DEA: 010M6604 EFIS: 0123000053 | 01-MEN-20-L34.2/L35.6 | REPLACE AC SURFACING, GPI (PAVING GRID), & DELINEATION. | MENDOCINO COUNTY IN AND NEAR WILLITS FROM MANOR WAY TO HAEHL OVERHEAD | 1 (01/23/2024) | Details CEM-3701 Report | |
994533 | Project ID: 994533 DEA: 010G6004 EFIS: 0117000026 | 01-MEN-1-R65.1/65.5 | ROADWAY EXCAVATION, PLACE HMA (TYPE A) & REINFORCED CONCRETE PIPE. | MENDOCINO COUNTY IN CLEONE FROM 0.1 MILE NORTH OF MILL CREEK DRIVE TO 0.3 MILE NORTH OF WARD AVENUE | 1 (04/25/2023) | Details CEM-3701 Report | |
328 | Project ID: 328 DEA: 01492604 | 01-MEN-1-59.8/62.0 | Replace traffic signal heads. | MENDOCINO COUNTY IN FORT BRAGG AT VARIOUS LOCATIONS FROM ROUTE 20 TO ELM STREET | 12/10/2012 | NOT VERIFIED | Details CEM-3701 Report |
994090 | Project ID: 994090 DEA: 01434804 EFIS: 0100000672 | 01-MEN-1-62.0/62.3 | Pudding Creek Bridge Widening | MENDOCINO COUNTY IN FORT BRAGG FROM ELM STREET TO PUDDING CREEK ROAD 421 | 1 (07/11/2022) | Details CEM-3701 Report | |
214927 | Project ID: 214927 DEA: 010J5304 EFIS: 0119000049 | 01-MEN-1-60.4/62.1 | REPAIR AC PAVEMENT BY COLD PLANING AC AND PLACING HMA. | MENDOCINO COUNTY IN FORT BRAGG FROM NOYO RIVER BRIDGE TO PUDDING CREEK BRIDGE | 01/04/2021 | 1 (06/10/2020) | Details CEM-3701 Report |
209310 | Project ID: 209310 DEA: 01497104 EFIS: 0100000684 | 01-MEN-5718- | CONSTRUCT OZONE SPARGE SYSTEM AND SPARGE WELLS FOR SOIL REMEDIATION. | MENDOCINO COUNTY IN LEGGETT AT THE LEGGETT MAINTENANCE STATION | 04/27/2018 | 1 (05/21/2014) | Details CEM-3701 Report |
212058 | Project ID: 212058 DEA: 010B8304 EFIS: 0112000188 | 01-MEN-101-47.1/47.6 | ADA INFRASTRUCTURE UPGRADE AND INSTALLATION. | MENDOCINO COUNTY IN WILLITS FROM 0.7 MILE NORTH OF ROUTE 20 TO 1.2 MILES NORTH OF ROUTE 20 | 08/27/2018 | 1 (07/06/2017) | Details CEM-3701 Report |
214917 | Project ID: 214917 DEA: 010J5204 EFIS: 0119000048 | 01-MEN-20-33.6/34.6 | COLD PLANE AC PAVEMENT AND PLACE HMA (TYPE A). | MENDOCINO COUNTY IN WILLITS FROM BAECHTEL CREEK BRIDGE TO MONICA LANE | 01/06/2021 | 1 (06/10/2020) | Details CEM-3701 Report |
212981 | Project ID: 212981 DEA: 01262034 EFIS: 0112000204 | 01-MEN-101-46.3/47.2 | REPLACE CONCRETE CURB, GUTTER, SIDEWALK, AND CURB RAMPS. | MENDOCINO COUNTY IN WILLITS FROM ROUTE 20 TO 0.9 MILE NORTH OF ROUTE 20 | 08/20/2020 | 1 (04/27/2018) | Details CEM-3701 Report |
210441 | Project ID: 210441 DEA: 010C6104 EFIS: 0113000086 | 01-MEN-1-40.2 | CLEAN AND PAINT BRIDGE | MENDOCINO COUNTY NEAR ALBION AT NAVARRO RIVER BRIDGE | 01/30/2017 | 1 (07/15/2015) | Details CEM-3701 Report |