Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11851-11860 of 17322 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
212994Project ID: 212994
DEA: 051J6204
MINOR: 05A2058
05-SB-101-20.0/20.2Make Temporary roadway repairs to reopen BN traffic. After fire evacuations are lifted, replace damaged pavement and drainage 09/30/20191 (09/30/2019)Details CEM-3701 Report
212995Project ID: 212995
DEA: 01262044
EFIS: 0112000203
01-MEN-101-47.2/47.3  10/05/20201 (06/26/2019)Details CEM-3701 Report
212996Project ID: 212996
DEA: 023H1404
02-TRI,SHA-36-0.0/R3.5,0.0/4.0AC OVERLAY, REPLACE AC SURFACE, GUARDRAIL, SHOULDER BACKINGSHASTA AND TRINITY COUNTIES FROM TRINITY COUNTY LINE TO 0.4 MILE EAST OF HARRISON GULCH ROAD AND FROM HUMBOLDT COUNTY LINE TO 0.2 MILE EAST OF MAD RIVER ROAD01/08/2019NOT VERIFIEDDetails CEM-3701 Report
212997Project ID: 212997
DEA: 023H2104
EFIS: 0217000070
02-PLU-70,89-53.5/58.4,21.0/29.9AC OVERLAY, REPLACE AC SURFACE, GUARDRAIL, SHOULDER BACKINGPLUMAS COUNTY ON ROUTE 70 FROM GREENHORN RANCH ROAD TO 0.2 MILE EAST OF SLOAT ROAD AND ON ROUTE 89 FROM 0.3 MILE SOUTH OF ALTA CAMP ROAD TO CANYON DAM PICNIC AREA01/09/20191 (02/02/2018)Details CEM-3701 Report
212998Project ID: 212998
DEA: 030G7504
EFIS: 0316000240
03-ED-50-R28.8/39.6COLD PLANE AND PLACE HOT MIX ASPHALT (TYPE A) OVERLAY.EL DORADO COUNTY AT POLLOCK PINES FROM SAWMILL ROAD UNDERCROSSING TO SOUTH FORK AMERICAN RIVER BRIDGE01/02/20191 (08/30/2018)Details CEM-3701 Report
212999Project ID: 212999
DEA: 030G7604
03-GLE-162-37.6/54.0COLD PLANE AC PAVEMENT AND RHMA-G OVERLAYGLENN COUNTY ABOUT 10 MILES WEST OF ELK CREEK FROM COUNTY ROAD 307 TO 2.8 MILES WEST OF COUNTY ROAD 30202/06/20191 (01/08/2019)Details CEM-3701 Report
213000Project ID: 213000
DEA: 030H2704
EFIS: 0315000119
03-YOL-5,113-VARMODIFY SIGNAL CONTROLLERS AND INSTALL INTERCONNECT CABLEYOLO COUNTY ON EAST MAIN STREET FROM YOLO 113 TO YOLO 512/04/20191 (01/08/2019)Details CEM-3701 Report
213001Project ID: 213001
DEA: 032F0804
EFIS: 0300020462
03-YUB-20,70-0.5/R2.0,14.1/15.2UPGRADE SIDEWALKS, CURBS, DRIVEWAYS, SIGNS & SIGNALS TO ADA STANDARDSYUBA COUNTY IN MARYSVILLE AT VARIOUS LOCATIONS ON ROUTE 20 FROM I STREET TO BUCHANAN STREET AND ON ROUTE 70 FROM 1ST STREET TO 18TH STREET10/06/20211 (06/18/2018)Details CEM-3701 Report
213002Project ID: 213002
DEA: 042640N4
EFIS: 0412000649
04-MRN,SON-101-MRN27.0/27.6SON0.0/4.5CONSTRUCT HOV LANESMARIN AND SONOMA COUNTIES IN AND NEAR PETALUMA FROM 0.6 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE TO 0.3 MILE SOUTH OF EAST WASHINGTON STREET OVER CROSSING03/12/20211 (04/13/2018)Details CEM-3701 Report
213003Project ID: 213003
DEA: 044G8104
EFIS: 0413000055
04-CC-242-R1.6STRUCTURE REHABILITATION AND BRIDGE RAILING REPLACEMENT.CONTRA COSTA COUNTY IN CONCORD AT BUCHANAN FIELD VIADUCT02/22/20191 (03/30/2018)Details CEM-3701 Report