Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11791-11800 of 17329 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993602 | Project ID: 993602 DEA: 042K2404 EFIS: 0416000394 | 04-SON,SON-101-16.5-19 | REMOVE EXISTING AND CONSTRUCT NEW CONCRETE BRIDGE RAILING. | MARIN AND SONOMA COUNTIES AT VARIOUS LOCATIONS | 07/24/2023 | 1 (03/07/2022) | Details CEM-3701 Report |
213136 | Project ID: 213136 DEA: 040Q5204 EFIS: 0418000111 | 04-MRN,SON-101-0.0/26.8,0.2/R56.2 | REPLACE PAVEMENT DELINEATION. | MARIN AND SONOMA COUNTIES FROM 0.5 MILE NORTH OF THE BEGINNING OF MARIN COUNTY LINE TO END OF SONOMA COUNTY LINE | 12/17/2019 | 1 (06/05/2018) | Details CEM-3701 Report |
213002 | Project ID: 213002 DEA: 042640N4 EFIS: 0412000649 | 04-MRN,SON-101-MRN27.0/27.6SON0.0/4.5 | CONSTRUCT HOV LANES | MARIN AND SONOMA COUNTIES IN AND NEAR PETALUMA FROM 0.6 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE TO 0.3 MILE SOUTH OF EAST WASHINGTON STREET OVER CROSSING | 03/12/2021 | 1 (04/13/2018) | Details CEM-3701 Report |
211777 | Project ID: 211777 DEA: 04209504 EFIS: 0412000116 | 04-MRN,SON-1-50.2/50.5,0.0/0.2 | REPLACE ESTERO BRIDGE AND REALIGN APPROACHING ROADWAY; Bridge No. 27-0121 | MARIN AND SONOMA COUNTIES NEAR VALLEY FORD FROM 0.4 MILE SOUTH OF ESTERO AMERICANO BRIDGE TO 0.2 MILE NORTH OF ESTERO AMERICANO BRIDGE | 10/21/2019 | 1 (01/17/2017) | Details CEM-3701 Report |
7670 | Project ID: 7670 MINOR: 04A3859 | 04-MRN-101,37,121,12-Various | FABRICATE AND INSTALL THIRTY-FIVE MISSION BELL MARKERS IN MARIN AND SONOMA COUNTIES ON ROUTES 101, 37, 121, AND 12 AT VARIOUS LOCATIONS. | MARIN AND SONOMA COUNTIES ON ROUTES 101, 37, 121, AND 12 AT VARIOUS LOCATIONS. | 1 (08/31/2012) | Details CEM-3701 Report | |
2426 | Project ID: 2426 DEA: 044S2504 | 04-MRN-108-5.1/7.1 | REPLACE AC SURFACING,COLD PLANE AC PAVEMENT AND PLACE HMA | Marin Co. near Stinson beach on county road A 108 from 2.0 miles north of Muir Woods Road to 2.0 miles south of route 1. | 04/18/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
993188 | Project ID: 993188 DEA: 040W9904 EFIS: 0420000321 MINOR: 04A6110 | 04-MRN-131-2.7 | Install Pedestrian Hybrid Beacons | Marin County | 1 (08/11/2021) | Details CEM-3701 Report | |
214530 | Project ID: 214530 DEA: 042G6904 EFIS: 0400021211 | 04-MRN-1-0.0/0.2,0.5/0.8 | RECONSTRUCT CONCRETE SIDEWALKS AND DRIVEWAYS. | MARIN COUNTY AT ALMONTE FROM ROUTE 101/1 SEPARATION TO 0.2 MILE NORTH OF ROUTE 101/1 SEPARATION AND FROM 0.1 MILE NORTH OF COYOTE CREEK BRIDGE TO FLAMINGO ROAD | 05/07/2021 | 1 (11/08/2019) | Details CEM-3701 Report |
209111 | Project ID: 209111 DEA: 044S7704 EFIS: 0400020144 | 04-MRN-1-1.0 | MODIFY AND UPGRADE DRAINAGE SYSTEM. | MARIN COUNTY AT MARIN CITY AT ROSS DRIVE. | 07/17/2015 | 1 (02/04/2014) | Details CEM-3701 Report |
212729 | Project ID: 212729 DEA: 044G8714 EFIS: 0416000152 | 04-MRN-101-15.4 | BRIDGE SCOUR MITIGATION | MARIN COUNTY AT MARINWOOD NEAR SAN RAFAEL AT MILLER CREEK BRIDGE | 10/26/2022 | 1 (08/22/2019) | Details CEM-3701 Report |