Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 11571-11580 of 17322 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
212697Project ID: 212697
DEA: 101C3004
EFIS: 1014000145
10-STA,SJ-99-R20.9/R24.7, 0.0/6.8RAMP WIDENING, DRAINAGE, RAMP METERS, AND FIBER OPTIC SYSTEM.STANISLAUS AND SAN JOAQUIN COUNTIES FROM 0.8 MILE SOUTH OF PELANDALE AVENUE OVERCROSSING IN MODESTO TO 0.2 MILE NORTH OF THE NORTH JUNCTION ROUTE 120/99 SEPARATION IN MANTECA01/04/20211 (01/25/2018)Details CEM-3701 Report
212698Project ID: 212698
DEA: 101F6304
EFIS: 1016000090
10-SJ-4-R20.1/29.5COLD PLANE AC PAVEMENT AND RESURFACE PAVEMENT WITH RHMA-G.SAN JOAQUIN COUNTY NEAR STOCKTON FROM ADELBERT AVENUE TO 0.4 MILE WEST OF VAN ALLEN ROAD11/21/2018NOT VERIFIEDDetails CEM-3701 Report
212699Project ID: 212699
DEA: 103A7304
EFIS: 1013000050
10-TUO,STA-108,120-L0.0/L2.8,11.2/T18.2,R0.0/R24.1COLD PLANE AC PAVEMENT AND PLACE RUBBERIZED HOT MIX ASPHALT.TUOLUMNE AND STANISLAUS COUNTIES NEAR SONORA ON ROUTE 108 FROM YOSEMITE JUNCTION TO MONTEZUMA ROAD AND ON ROUTE 120 FROM 0.2 MILE WEST OF LANCASTER ROAD TO MOCCASIN CREEK BRIDGE07/09/20191 (12/13/2018)Details CEM-3701 Report
212700Project ID: 212700
DEA: 11415304
EFIS: 1113000018
11-SD-163-2.5/4.0HFST, ENHANCE STRIPING AND LIGHTING, INSTALL CONCRETE BARRIER AND MGSSAN DIEGO COUNTY IN SAN DIEGO FROM ROBINSON AVENUE OVERCROSSING TO SAN DIEGO RIVER BRIDGE10/02/20191 (02/28/2018)Details CEM-3701 Report
212701Project ID: 212701
DEA: 120M9104
EFIS: 1213000036
12-ORA-90-0.6/8.0REPLACE CURB RAMPS, DRIVEWAYS & SIDEWALKS, MODIFY ELECTRICAL SYSTEMORANGE COUNTY FROM LA HABRA HILLS IN LA HABRA TO ROSE DRIVE IN PLACENTIA01/04/20211 (03/22/2018)Details CEM-3701 Report
212702Project ID: 212702
DEA: 120N2604
EFIS: 1213000186
12-ORA-1-11.6PLACE HMA AND CONC BARRIER (TYPE K) AND PREPARE AND STAIN CONCRETE.ORANGE COUNTY NEAR LAGUNA BEACH AT 0.1 MILE NORTH OF MORO RIDGE ROAD07/01/20211 (02/14/2018)Details CEM-3701 Report
212703Project ID: 212703
DEA: 120N6004
EFIS: 1214000066
12-ORA-142-R0.8/2.9COLD PLANE/OVERLAY, REPLACE ROADWAY SIGNS, UPGRADE CURB RAMPSORANGE COUNTY IN BREA FROM ROUTE 90/142 TO BREA HILLS AVENUE12/31/20191 (03/15/2018)Details CEM-3701 Report
212704Project ID: 212704
DEA: 071XF004
EFIS: 0717000344
07-LA-1-8.6/8.8, 8.6-8.8Re-Face corroded and damaged crib walls 03/12/20211 (03/12/2021)Details CEM-3701 Report
212705Project ID: 212705
DEA: 033H7604
03-ED-49-11.3/11.7Replace Damaged Culverts 01/08/20191 (09/18/2017)Details CEM-3701 Report
212706Project ID: 212706
DEA: 051J4004
EFIS: 0517000095
05-SCR,SCR-9-11.0, 11.00Repair Slipout damage by constructing sidehill viaduct 09/20/20221 (09/18/2017)Details CEM-3701 Report