Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11561-11570 of 17322 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
212687 | Project ID: 212687 DEA: 06442544 EFIS: 0612000175 | 06-KER-46,5-31.5-33.2 | CONVERT 2-LANE TO 4-LANE CONVENTIONAL HIGHWAY. | KERN COUNTY NEAR LOST HILLS FROM 1.0 MILE EAST OF LOST HILLS ROAD TO 0.7 MILE EAST OF ROUTE 46/5 SEPARATION | 11/19/2021 | 1 (03/12/2018) | Details CEM-3701 Report |
212688 | Project ID: 212688 DEA: 080Q8904 EFIS: 0800020582 | 08-RIV,SBD-10,215,111-Var | BRIDGE REHABILITATION | RIVERSIDE AND SAN BERNARDINO COUNTIES AT VARIOUS LOCATIONS | 06/23/2021 | 1 (02/28/2018) | Details CEM-3701 Report |
212689 | Project ID: 212689 DEA: 081C0604 EFIS: 0812000256 | 08-RIV-10-44.4/51.7 | COLD PLANE AND OVERLAY RUBBERIZED HOT MIX ASPHALT (TYPE G) | RIVERSIDE COUNTY FROM 0.1 MILE WEST OF MONTEREY AVENUE OVERCROSSING TO 0.6 MILE WEST OF JEFFERSON STREET OVERCROSSING | 06/23/2021 | 1 (03/14/2018) | Details CEM-3701 Report |
212690 | Project ID: 212690 DEA: 081F2804 | 08-SBD-40-R134.0 | REMOVE AND PLACE ROCK SLOPE PROTECTION | SAN BERNARDINO COUNTY NEAR NEEDLES AT SOUTH FORK PIUTE WASH BRIDGE | 12/02/2019 | 1 (01/07/2019) | Details CEM-3701 Report |
212691 | Project ID: 212691 DEA: 081G1914 EFIS: 0816000193 | 08-SBD-210-0.0/10.3 | THERMOPLASTIC TRAFFIC STRIPE AND MARKING. | SAN BERNARDINO COUNTY FROM LOS ANGELES COUNTY LINE TO 0.2 MILE WEST OF EAST AVENUE OVERCROSSING | 06/23/2021 | 1 (03/20/2018) | Details CEM-3701 Report |
212692 | Project ID: 212692 DEA: 09352104 EFIS: 0900020090 | 09-INY-168,395-17.5/18.3,114.9/116.4 | CONSTRUCT CONCRETE SIDEWALKS, CURB RAMPS AND DRIVEWAYS. | INYO COUNTY IN BISHOP ON ROUTE 168 FROM 0.1 MILE WEST OF PIONEER LANE TO ROUTE 395 AND ON ROUTE 395 FROM 0.1 MILE SOUTH OF JAY STREET TO 0.4 MILE NORTH OF MAC IVER STREET | 06/23/2021 | 1 (05/03/2018) | Details CEM-3701 Report |
212693 | Project ID: 212693 DEA: 100G7204 EFIS: 1012000039 | 10-SJ-4,5-R16.0,25.8/26.2 | SEISMIC RETROFIT VARIOUS BRIDGES. | SAN JOAQUIN COUNTY IN STOCKTON AT ROUTE 5/4 SEPARATION | 01/24/2020 | 1 (01/24/2018) | Details CEM-3701 Report |
212694 | Project ID: 212694 DEA: 100P8404 EFIS: 1012000189 | 10-SJ-4-2.1 | CONSTRUCT ROCK SLOPE PROTECTION. | SAN JOAQUIN COUNTY NEAR DISCOVERY BAY AT 2.3 MILES WEST OF MIDDLE RIVER BRIDGE | 11/20/2018 | NOT VERIFIED | Details CEM-3701 Report |
212695 | Project ID: 212695 DEA: 100Y5504 EFIS: 1013000239 | 10-SJ-12-17.1/17.7 | MODIFY CURB RAMPS, SIDEWALKS AND DRIVEWAYS. | SAN JOAQUIN COUNTY IN LODI FROM SOUTH SCHOOL STREET TO SOUTH CENTRAL AVENUE. | 11/21/2018 | 1 (02/15/2018) | Details CEM-3701 Report |
212696 | Project ID: 212696 DEA: 101C1804 EFIS: 1014000101 | 10-MER,STA-99-R35.9/R37.3,R0.0/R0.2 | REPLACE SHOULDER WITH HOT MIX ASPHALT AND REPLACE CONCRETE PAVEMENT. | MERCED AND STANISLAUS COUNTIES NEAR TURLOCK FROM 0.3 MILE NORTH OF BRADBURY ROAD OVERCROSSING TO 0.2 MILE NORTH OF STANISLAUS COUNTY LINE | 01/24/2020 | 1 (12/13/2018) | Details CEM-3701 Report |