Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11531-11540 of 17307 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
993747 | Project ID: 993747 DEA: 07385704 EFIS: 0722000162 | 07-LA-210-R7.5/R7.8 | REMOVE CHAIN LINK FENCE, INSTALL CHAIN LINK FENCE AND ACCESS GATE. | LOS ANGELES COUNTY IN LOS ANGELES FROM KAGEL CANYON STREET PEDESTRIAN UNDERCROSSING TO FOOTHILL BOULEVARD UNDERCROSSING | 07/03/2023 | 1 (05/11/2022) | Details CEM-3701 Report |
209240 | Project ID: 209240 DEA: 07259204 EFIS: 0700020196 | 07-LA-10-R8.8/13.5 | CONSTRUCT AUSTIN VAULT SAND FILTER BEDS. | LOS ANGELES COUNTY IN LOS ANGELES FROM LA CIENEGA BOULEVARD TO 0.3 MILE WEST OF VERMONT AVENUE | 04/11/2017 | 1 (04/18/2014) | Details CEM-3701 Report |
212602 | Project ID: 212602 DEA: 07296204 EFIS: 0713000029 | 07-LA-91-R11.8/R14.1 | PERFORM PLANTING AND CONSTRUCT STAMPED CONCRETE AND ROCK BLANKET. | LOS ANGELES COUNTY IN LOS ANGELES FROM LOS ANGELES RIVER BRIDGE TO DOWNEY AVENUE UNDERCROSSING | 08/03/2023 | 1 (03/29/2018) | Details CEM-3701 Report |
4308 | Project ID: 4308 DEA: 073Y8504 | 07-LA-27-17.0/18.6 | Place rubberized hot mix asphalt (Gap Graded). | LOS ANGELES COUNTY IN LOS ANGELES FROM NORDHOFF STREET TO DEVONSHIRE STREET | 04/27/2011 | 1 (04/27/2011) | Details CEM-3701 Report |
1000286 | Project ID: 1000286 DEA: 070W7004 | 07-LA-405-44.7/48.64 | INDIVIDUAL SLAB REPLACEMENT (RSC), & GRIND EXIST CONC PAVEMENT. | LOS ANGELES COUNTY IN LOS ANGELES FROM NORDHOFF STREET UNDERCROSSING TO ROUTE 5/405 SEPARATION | NOT VERIFIED | Details CEM-3701 Report | |
209452 | Project ID: 209452 DEA: 074Y9704 EFIS: 0700020808 | 07-LA-101-8.0/11.5 | COLD PLANE AC PVMT AND PLACE RHMA, SUPERPAVE. | LOS ANGELES COUNTY IN LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO MOORPARK STREET UNDERCROSSING | 05/12/2015 | NOT VERIFIED | Details CEM-3701 Report |
215609 | Project ID: 215609 DEA: 074W9404 EFIS: 0720000196 | 07-LA-101-0.0/1.0 | COLD PLANE AND OVERLAY WITH RUBBERIZED HOT MIX ASPHALT, SLURRY SEAL. | LOS ANGELES COUNTY IN LOS ANGELES FROM ROUTE 10/101 SEPARATION TO SPRING STREET OVERCROSSING | 07/14/2022 | 1 (08/17/2021) | Details CEM-3701 Report |
212197 | Project ID: 212197 DEA: 073W4804 EFIS: 0716000158 | 07-LA-170-R14.6/R20.6 | REPLACE PCC PAVEMENT AND REPAIR AND RESURFACE AC PAVEMENT. | LOS ANGELES COUNTY IN LOS ANGELES FROM ROUTE 101/170 SEPARATION TO ROUTE 170/5 SEPARATION | 06/16/2021 | 1 (07/10/2017) | Details CEM-3701 Report |
213170 | Project ID: 213170 DEA: 07314704 EFIS: 0715000131 | 07-LA-110-10.1/20.4 | INSTALL BARRIER MARKERS, STRIPING, SIGNS, AND FLASHING BEACONS. | LOS ANGELES COUNTY IN LOS ANGELES FROM ROUTE 110/91 SEPARATION TO 30TH STREET OVERCROSSING | 01/06/2020 | 1 (06/26/2018) | Details CEM-3701 Report |
995449 | Project ID: 995449 DEA: 07349504 EFIS: 0718000161 | 07-LA-2,5,101,170-Var | INSTALL NEW TRANSPORTATION MANAGEMENT SYSTEM ELEMENTS. | LOS ANGELES COUNTY IN LOS ANGELES FROM ROUTE 134/170 SEPARATION TO ROUTE 170/5 SEPARATION | 1 (01/22/2024) | Details CEM-3701 Report |