Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11491-11500 of 17307 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
212614 | Project ID: 212614 DEA: 101G6704 EFIS: 1017000023 MINOR: 10A1895 | 10-MER-99-27.8 | Overhead Sign Structure and Guardrail | Near Livingston at 0.7 miles north of Sultana Drive Over crossing | 12/28/2022 | 1 (08/18/2017) | Details CEM-3701 Report |
212615 | Project ID: 212615 Permit Numbers: 1217NRW0329 | 12--- | 08/22/2018 | 1 (03/29/2018) | Details CEM-3701 Report | ||
212616 | Project ID: 212616 DEA: 030H8504 EFIS: 0316000025 MINOR: 03A2566 | 03-ED-50-15.8 | Forni Road | Placerville | 09/30/2021 | 1 (08/03/2017) | Details CEM-3701 Report |
212617 | Project ID: 212617 DEA: 051E0204 EFIS: 0513000025 | 05-MON-152-1.3-2.0 | WATSONVILLE 152 ADA | IN SANTA CRUZ COUNTY NEAR WATSONVILLE FROM WAGNER AVENUE TO HOLOHAN ROAD | 12/30/2019 | 1 (08/19/2019) | Details CEM-3701 Report |
212618 | Project ID: 212618 DEA: 044G0564 EFIS: 0417000154 | 04-ALA-680-M2.4/M12.4 | ROADWAY REHAB, BRIDGE REPLACEMENT, RET. WALLS, TOLL SYSTEMS | FREMONT AND AT SUNOL FROM MISSION BOULEVARD SEPARATION TO KOOPMAN ROAD UNDERCROSSING | 12/08/2022 | 1 (10/16/2017) | Details CEM-3701 Report |
212619 | Project ID: 212619 Permit Numbers: 0415NMC1247 0417NRT1097 | 04---45.3/45.3 | Installation of new storm drainage system including storm pipes (12" & 15" diameter)a manhole and a catch basin;replacement of sidewalks,curbs & gutters;construction of bulb-outs,ADA ramps,crosswalk:installation of new street lights irrigation lines,new striping and pavement markin | Martin Luther King Jr. Way, Oakland | 01/18/2019 | 1 (08/01/2017) | Details CEM-3701 Report |
212620 | Project ID: 212620 Permit Numbers: 04166DP2574 04166SN0254 04176RT1479 04176RT1404 | 04-SM-101-23.5/23.5 | Work within the State right-of-Way includes adding a new signal head and traffic sign to an existing signal post. | Airport Boulevard, South San Francisco | 01/22/2020 | 1 (08/01/2017) | Details CEM-3701 Report |
212621 | Project ID: 212621 DEA: 051J0904 | 05-SCR-152-4/8.3, 4.14/8.29 | Embankment reconstruction, remove and haul off slide material, repair drainage system and roadway to open restricted travel | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report | |
212622 | Project ID: 212622 DEA: 051F0804 EFIS: 0513000052 | 05-MON-1-2.5-67.3 | REPLACEMENT OF 7 CULVERTS ALONG HWY 1. | ON ROUTE 1 IN MONTEREY COUNTY AT VARIOUS LOCATIONS BETWEEN 2.5 MILES NORTH OF THE MONTEREY/SAN LUIS OBISPO COUNTY LINE AND 0.6 MILES SOUTH OF MALPASO CREEK BRIDGE. | 08/23/2021 | 1 (09/30/2019) | Details CEM-3701 Report |
212623 | Project ID: 212623 DEA: 074P1804 EFIS: 0716000173 MINOR: 07A4243 | 07-LA-5,116- | North of Sheldon | 1 (08/28/2017) | Details CEM-3701 Report |