Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11481-11490 of 17277 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
212543 | Project ID: 212543 DEA: 051J1404 EFIS: 0517000065 | 05-MON-68-11.93 | excavate and repair sinkhole, replace culvert, restore roadway | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report | |
212544 | Project ID: 212544 DEA: 033H3704 EFIS: 0317000335 | 03-SAC-5.50,5,50-15.5, 18.21, 6.15 | Repair damaged sound walls | 01/02/2019 | 1 (09/18/2017) | Details CEM-3701 Report | |
212667 | Project ID: 212667 DEA: 060V8004 EFIS: 0616000241 MINOR: 06A2362 | 06-KER-5-13.6 | Wheeler Ridge Road Improvements | 07/27/2023 | 1 (04/11/2019) | Details CEM-3701 Report | |
212546 | Project ID: 212546 Permit Numbers: 1016NMC0761 1017NDP0373 1018NRT0765 | 10---17.1/17.4 | Construct a single lane roundabout at the intersection of State Route 49 and Main Street in the City of Plymouth in Amador County. Work includes approach roadways modification, sidewalks, landscaping, underground and roadside drainage facilities, waterline replacement, retaining wall, lighting, and | SR 49, Plymouth | 1 (07/05/2017) | Details CEM-3701 Report | |
214079 | Project ID: 214079 DEA: 074P6405 EFIS: 0718000243 MINOR: 07A4498 | 07-LA-405-33.71/34.71 | INSTALLATION OF CHANGEABLE MESSAGE SIGNS (CMS). | 1 (07/11/2019) | Details CEM-3701 Report | ||
212548 | Project ID: 212548 DEA: 040G2001 EFIS: 0400000316 | 04-ALA-80-3.7-4.4 | Construct Bicycle-Pedestrian OC | In Alameda County in the city of Emeryville on I-80 from Powell Street UC to Junction SR 123 | 2 (09/09/2019) | Details CEM-3701 Report | |
212550 | Project ID: 212550 DEA: 044H0104 EFIS: 0413000132 | 04-ALA-880-20.9/22.1 | ROADSIDE SLOPE AREA PAVING | SAN LEANDRO BETWEEN WASHINGTON AVENUE AND MARIANA BOULEVARD OVERCROSSING | 10/21/2019 | 1 (01/10/2018) | Details CEM-3701 Report |
212553 | Project ID: 212553 DEA: 120Q5604 EFIS: 1217000065 | 12-ORA-91-18.65/18.8 | To remove dirt and debris flow and clear three 36" diameter reinforced concrete culvert drain pipes | 1 (03/22/2018) | Details CEM-3701 Report | ||
212554 | Project ID: 212554 DEA: 101H6804 | 10-AMA-88-54.0, 54.00, 54 | Clean up, repair & replace the diesel generator fuel supply system | On state route 88 at Peddler Hill Maintenance Station in Amador County | 03/22/2023 | 1 (04/11/2019) | Details CEM-3701 Report |
212555 | Project ID: 212555 DEA: 040P7804 EFIS: 0417000533 | 04-SOL-220-2.1, 2.10 | Construct shoulder backing | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report |