Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11471-11480 of 17310 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
212592 | Project ID: 212592 DEA: 120J4004 EFIS: 1200020177 | 12-ORA,LA-39-12.4/17.3,17.3/17.4 | PAVEMENT REHABILITATION AND ADA RAMPS | ORANGE AND LOS ANGELES COUNTIES AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF LINCOLN AVENUE IN ANAHEIM TO 0.1 MILE NORTH OF ROSECRANS AVENUE IN LA MIRADA | 02/19/2020 | 1 (03/22/2018) | Details CEM-3701 Report |
212593 | Project ID: 212593 DEA: 051J1204 EFIS: 0517000063 | 05-SCR,SCR-17-9.8/10.8 | Repair slipout damage by constructing retaining wall and regrading failed embankment | 05/24/2019 | 1 (08/04/2017) | Details CEM-3701 Report | |
212594 | Project ID: 212594 DEA: 00000001 | --- | CMTB Special Projects - Carbon Sequestered Aggregate Testing (Blue Planet) | Project created as a tracking page for status updates, info sharing, etc. | NOT VERIFIED | Details CEM-3701 Report | |
212595 | Project ID: 212595 Permit Numbers: 1116NMC0953 1117NDP0234 | 11--5-19.7/29.1 | REFER TO Caltrans EA: 11-2T1734 for this ALTERNATE DELIVERY (CMGC) Project. State Highway right of way in San Diego County, City of San Diego, on Route 5, post mile R19.70 to R29.10, to construct the blue line trolley extension | INTERSTATE 5, SAN DIEGO | 08/24/2021 | 2 (07/26/2017) | Details CEM-3701 Report |
212596 | Project ID: 212596 DEA: 100L0204 EFIS: 1013000053 | 10-SJ,STA-99-0.0-0.7:24.4-24.8 | Partial Bridge Replacement | ON ROUTE 99 IN RIPON AT THE COUNTY LINE OF SAN JOAQUIN COUNTY AND STANISLAUS COUNTY AT THE STANISLAUS RIVER BRIDGES (29-0013L/R). | 07/15/2021 | 1 (12/19/2018) | Details CEM-3701 Report |
212598 | Project ID: 212598 DEA: 044G4904 EFIS: 0412000491 | 04-NAP-29-11.9 | CONCRETE BARRIER, HMA PAVEMENT, DRAINAGE IMPROVEMENTS | NAPA COUNTY IN NAPA AT LINCOLN-SOLANO ON-RAMP | 08/01/2018 | 1 (10/18/2017) | Details CEM-3701 Report |
212599 | Project ID: 212599 DEA: 06332214 EFIS: 0616000123 | 06-TUL-99-31.2/32.5 | HIGHWAY PLANTING, IRRIGATION, AND PLANT ESTABLISHMENT. | TULARE COUNTY IN AND NEAR TULARE FROM 0.7 MILE SOUTH TO 0.6 MILE NORTH CARTMILL AVENUE OVERCROSSING | 11/23/2021 | 1 (05/07/2018) | Details CEM-3701 Report |
212600 | Project ID: 212600 DEA: 07293704 EFIS: 0713000239 | 07-LA-110,405-8.0/9.0,12.2/13.2 | WIDEN SHOULDER AND AUXILIARY LANE OF CONNECTOR. | LOS ANGELES COUNTY IN AND NEAR CARSON ON ROUTE 110 FROM 0.2 MILE NORTH OF TORRANCE BOULEVARD UNDERCROSSING TO 190TH STREET UNDERCROSSING AND ON ROUTE 405 FROM MAIN STREET UNDERCROSSING TO 190TH STREET UNDERCROSSING | 08/03/2023 | 1 (04/03/2018) | Details CEM-3701 Report |
212601 | Project ID: 212601 DEA: 07295904 EFIS: 0713000033 | 07-LA-110-17.9/19.5 | PLACE VEGETATION CONTROL, CONCRETE TEXTURED PAVING AND ROCK BLANKET. | LOS ANGELES COUNTY IN LOS ANGELES FROM 0.1 MILE SOUTH OF SLAUSON AVENUE OVERHEAD TO MARTIN LUTHER KING JUNIOR BOULEVARD UNDERCROSSING | 02/08/2019 | NOT VERIFIED | Details CEM-3701 Report |
212602 | Project ID: 212602 DEA: 07296204 EFIS: 0713000029 | 07-LA-91-R11.8/R14.1 | PERFORM PLANTING AND CONSTRUCT STAMPED CONCRETE AND ROCK BLANKET. | LOS ANGELES COUNTY IN LOS ANGELES FROM LOS ANGELES RIVER BRIDGE TO DOWNEY AVENUE UNDERCROSSING | 08/03/2023 | 1 (03/29/2018) | Details CEM-3701 Report |