Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 11411-11420 of 17307 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
212466 | Project ID: 212466 DEA: 080J6104 EFIS: 0800000308 Permit Numbers: 0817AOP0417 0817ADP0959 0818AUR0025 0817ARW0663 0818ART0485 | 08--15-36.4/37.6 | Enter onto Interstate 15 right of way at Cajalco Road to reconstruct the interchange by replacing the existing 2-lane overcrossing bridge with a new six-lane bridge, reconfigure the NB ramps into a partial cloverleaf, and to relocate the SB ramps further to the west, as per permit Plans and Special | I-15 /Cajalco Rd Interchange, Corona | 2 (02/12/2018) | Details CEM-3701 Report | |
212467 | Project ID: 212467 DEA: 024G4904 EFIS: 0214000004 | 02-SHA-44-44.9/45.5 | EXCAVATE AND HAUL SOIL/ROCK, PLACE AB/HMA, PROVIDE TRAFFIC CONTROL | IN SHASTA COUNTY NEAR VIOLA FROM 1.7 MILES TO 1.1 MILES WEST OF NORTH BATTLE CREEK RESERVOIR ROAD | 08/30/2018 | 1 (05/23/2017) | Details CEM-3701 Report |
212468 | Project ID: 212468 DEA: 113A0534 EFIS: 1117000127 | 11-SD-75- | 1 (05/25/2017) | Details CEM-3701 Report | |||
212469 | Project ID: 212469 DEA: 09368804 EFIS: 0916000024 MINOR: 09A0673 | 09-- 14-VAR | Treat four bridge decks at three locations in Kern County on Highway 14 with Methacrylate. Minor repair of spalled areas per Engineer's direction on those same bridge decks. | for CONSTRUCTION ON STATE HIGHWAY IN KERN COUNTY NEAR MOJAVE AT VARIOUS LOCATIONS | 1 (06/24/2021) | Details CEM-3701 Report | |
212471 | Project ID: 212471 DEA: 010B4204 EFIS: 0112000126 | 01-HUM-101-110.6,R113.8 | REPLACE 2 DRAINAGE SYSTEMS AND INSTALL HORIZONTAL DRAINS | HUMBOLDT COUNTY NEAR TRINIDAD AT 1.9 MILES SOUTH OF KANE ROAD AND AT 1.3 MILES NORTH OF KANE ROAD | 12/04/2019 | 1 (10/03/2017) | Details CEM-3701 Report |
212472 | Project ID: 212472 DEA: 010B6904 EFIS: 0112000184 | 01-LAK-29-R41.4 | WIDEN ROADWAY, CONSTRUCT PEDESTRIAN FACILITIES | LAKE COUNTY IN LAKEPORT AT LAKEPORT BOULEVARD OVERCROSSING | 02/26/2019 | 1 (10/03/2017) | Details CEM-3701 Report |
212473 | Project ID: 212473 DEA: 010E1004 EFIS: 0113000124 | 01-HUM-96,101-12.3,87.8 | CLEAN & PAINT BRIDGES | HUMBOLDT COUNTY ON ROUTE 96 AT TRINITY RIVER BRIDGE AND ON ROUTE 101 AT ARCATA OVERHEAD | 11/27/2018 | 1 (10/03/2017) | Details CEM-3701 Report |
212474 | Project ID: 212474 DEA: 051C9704 EFIS: 0513000020 | 05-SB-101-17.2/45.9 | PAVING GORE AREA, CONSTRUCT MVP, AND RESETTING ROADSIDE SIGNS. | SANTA BARBARA COUNTY AT VARIOUS LOCATIONS FROM 0.6 MILE NORTH OF LAS POSITAS ROAD OVERCROSSING TO 1.3 MILES SOUTH OF GAVIOTA TUNNEL | 08/19/2019 | 1 (06/19/2017) | Details CEM-3701 Report |
212475 | Project ID: 212475 DEA: 060K2904 EFIS: 0600020018 | 06-FRE-99-22.7/28.1 | INSTALL RAMP METERS, CONSTRUCT SIGN STRUCTURES, AND WIDEN RAMPS. | FRESNO COUNTY IN FRESNO AT VARIOUS LOCATIONS FROM BELMONT AVENUE TO SHAW AVENUE | 01/31/2020 | 1 (11/22/2017) | Details CEM-3701 Report |
212476 | Project ID: 212476 DEA: 06487514 EFIS: 0614000073 | 06-KIN-198-R16.5/R17.2 | HIGHWAY PLANTING. | KINGS COUNTY IN HANFORD FROM 0.4 MILE WEST OF 12TH AVENUE OVERCROSSING TO 0.3 MILE EAST OF 12TH AVENUE OVERCROSSING | 10/22/2020 | 1 (12/28/2017) | Details CEM-3701 Report |