Project Details
This page displays current information for project DEA: 00000000.
Project Information
Project Identifiers | Project ID: 9999 DEA: 00000000 EFIS: 0000000000 COOP: 99999333399 MINOR: 333333 Permit Numbers: 555555 0400NRT0000 |
---|---|
DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME DEVELOPERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME DEVELOPERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
QA Service Level | 1 (Verified on 04/05/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
retest@tssss.com | RE_first RE_last | Resident Engineer | Caltrans RE DB |
REO@email.com | REO_first REO_last | Oversight Resident Engineer | Caltrans REO DB |
SR_email@gmail.com | SR_First SR_Last | Structural Representative | Caltrans SR DB |
SRO@email.com | SRO_first SRO_last | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 163 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-01-09-4 | 01/09/2020 | 01/13/2020 | Department Acceptance | SMTL TM5 - Welded Hoops | View |
2020-01-30-7 | 01/30/2020 | 02/04/2020 | Department Acceptance | SMTL TM5 - Welded Hoops | View |
2020-01-30-8 | 01/30/2020 | 02/04/2020 | Department Acceptance | SMTL TM5 - Welded Hoops | View |
2020-01-30-9 | 01/30/2020 | 02/04/2020 | Department Acceptance | SMTL TM5 - Welded Hoops | View |
2020-01-30-10 | 01/30/2020 | 02/04/2020 | Department Acceptance | SMTL TM5 - Welded Hoops | View |
2020-01-30-11 | 01/30/2020 | 02/04/2020 | Department Acceptance | SMTL TM5 - Welded Hoops | View |
2020-01-30-12 | 01/30/2020 | 02/04/2020 | Department Acceptance | SMTL TM5 - Welded Hoops | View |
2020-01-29-13 | 01/29/2020 | 01/30/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2020-05-19-1 | 05/19/2020 | 05/20/2020 | Recertification | SMTL TM5 - Welded Hoops | View |
2017-09-21-1 | 09/21/2017 | Verification | SMTL TM5 - Couplers | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-10 of 50 results.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
JMF3511-72-2024-4 | Submittal In Progress | CT D04 - Hayward Field Laboratory - Deactivated | 02/08/2024 | View | |
JMF3511-208-2024-3 | Submittal Rejected For Use | CT HQ - Sacramento Hot Mix Asphalt Laboratory | 02/07/2024 | View | |
JMF3511-208-2024-2 | Submittal In Progress | CT HQ - Sacramento Hot Mix Asphalt Laboratory | 02/07/2024 | View | |
JMF3511-208-2024-1 | Submittal In Progress | CT HQ - Sacramento Hot Mix Asphalt Laboratory | 02/07/2024 | View | |
JMF3511-208-2023-53 | Submittal Rejected For Use | CT HQ - Sacramento Hot Mix Asphalt Laboratory | 10/24/2023 | View | |
JMF3511-208-2023-38 | Submittal Accepted for Verification | CT HQ - Sacramento Hot Mix Asphalt Laboratory | 10/12/2023 | View | |
JMF3511-208-2023-23 | Submittal Authorized For Use | CT HQ - Sacramento Hot Mix Asphalt Laboratory | 10/06/2023 | View | |
JMF3511-208-2023-1 | Submittal Accepted for Verification | CT HQ - Sacramento Hot Mix Asphalt Laboratory | 02/09/2023 | View | |
JMF3511-208-2022-35 | Submittal Authorized For Use | CT HQ - Sacramento Hot Mix Asphalt Laboratory | 12/07/2022 | View | |
JMF3511-208-2022-33 | Submittal Rejected For Use | CT HQ - Sacramento Hot Mix Asphalt Laboratory | 12/07/2022 | View |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-1 of 1 result.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
4790066131.101.1 | Carbon Steel Rebar | Cascade Steel Rolling Mills, Incorporated | CT HQ - Sacramento Statewide Materials Support Branch Field Office (Dominika Ercolini) | 1000 lb |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods