Project Details
This page displays current information for project DEA: 120T8704.
Project Information
Project Identifiers | Project ID: 995535 DEA: 120T8704 EFIS: 1222000109 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5,57-30.3/39.6,10.7/21.8 |
Award Date | 03/01/2024 |
Closeout Date | Not set |
Work Description | APPLY METHACRYLATE, POLYESTER CONCRETE, AND REPLACE JOINT SEALS. |
Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS ON ROUTE 5 FROM ROUTE 5/55 SEPARATION TO EUCLID STREET OVERCROSSING AND ON ROUTE 57 FROM ROUTE 5/57 SEPARATION TO TONNER CANYON ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 01/26/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
karim.ahmed@dot.ca.gov | Karim Ahmed | Resident Engineer | Caltrans RE DB |
bigjan.ronagh-langroodi@dot.ca.gov | Bijan Ronagh-Langroodi | Structural Representative | Caltrans SR DB |
keivan.hassan@dot.ca.gov | Keivan Hassan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 10 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-09-04-36 | 09/04/2024 | 09/04/2024 | Quality Control | Aggregate | View |
2024-09-04-37 | 09/04/2024 | 09/05/2024 | Quality Control | Aggregate | View |
2024-09-04-38 | 09/04/2024 | 09/04/2024 | Quality Control | Aggregate | View |
2024-09-03-1 | 09/03/2024 | 09/03/2024 | Quality Control | Concrete | View |
2024-08-29-6 | 08/29/2024 | 08/29/2024 | Quality Control | Concrete | View |
2024-07-17-62 | 07/17/2024 | 07/17/2024 | Quality Control | Methacrylate | View |
2024-07-15-58 | 07/15/2024 | 07/16/2024 | Quality Control | Polyester | View |
2024-07-15-59 | 07/15/2024 | 07/16/2024 | Quality Control | Polyester | View |
2024-06-18-74 | 06/18/2024 | 06/18/2024 | Quality Control | Methacrylate | View |
2024-06-11-65 | 06/11/2024 | 06/11/2024 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods