Project Details
This page displays current information for project DEA: 070W7104.
Project Information
Project Identifiers | Project ID: 995533 DEA: 070W7104 EFIS: 0723000034 |
---|---|
DIST-CO-RTE-PM | 07-LA-105-R13.4/R18.1 |
Award Date | 03/05/2024 |
Closeout Date | Not set |
Work Description | DIGOUT, SLURRY SEAL, COLD PLANE OVERLAY, AND PAVEMENT DELINEATION. |
Location Description | LOS ANGELES COUNTY FROM LOS ANGELES RIVER BRIDGE SEPARATION IN PARAMOUNT TO STUDEBAKER ROAD IN NORWALK |
QA Service Level | 1 (Verified on 01/22/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
steven.taing@dot.ca.gov | Steven Taing | Resident Engineer | Caltrans RE DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 42 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-06-14-50 | 06/14/2024 | 06/19/2024 | Verification | Asphalt Binder | View |
2024-06-13-82 | 06/13/2024 | 06/19/2024 | Acceptance | Hot Mix Asphalt | View |
2024-06-13-81 | 06/13/2024 | 06/19/2024 | Acceptance | Hot Mix Asphalt | View |
2024-06-14-41 | 06/14/2024 | 06/19/2024 | Verification | Aggregate | View |
2024-06-14-40 | 06/14/2024 | 06/19/2024 | Production Start-Up | Hot Mix Asphalt | View |
2024-06-18-3 | 06/18/2024 | 06/18/2024 | Acceptance | Hot Mix Asphalt | View |
2024-06-11-82 | 06/11/2024 | 06/15/2024 | Acceptance | Hot Mix Asphalt | View |
2024-06-11-73 | 06/11/2024 | 06/14/2024 | Acceptance | Aggregate | View |
2024-06-05-89 | 06/05/2024 | 06/07/2024 | Acceptance | Aggregate | View |
2024-06-07-63 | 06/07/2024 | 06/14/2024 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods