Project Details
This page displays current information for project DEA: 060X0604.
Project Information
Project Identifiers | Project ID: 995446 DEA: 060X0604 EFIS: 0618000015 |
---|---|
DIST-CO-RTE-PM | 06-FRE-198-0.5/19.5 |
Award Date | 05/08/2024 |
Closeout Date | Not set |
Work Description | REMOVE AND REPLACE CULVERTS AND CURED IN PLACE PIPELINER. |
Location Description | FRESNO COUNTY AT VARIOUS LOCATIONS FROM 1.3 MILES WEST OF WARTHAN CREEK OVERCROSSING TO 1.7 MILES WEST OF FIRESTONE AVENUE |
QA Service Level | 1 (Verified on 11/16/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
tyler.street@dot.ca.gov | Tyler Street | Resident Engineer | Caltrans RE DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 22 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-05-13-13 | 05/13/2025 | 05/13/2025 | Quality Control | Concrete | View |
2025-05-09-26 | 05/09/2025 | 05/09/2025 | Quality Control | Concrete | View |
2025-05-08-46 | 05/08/2025 | 05/08/2025 | Quality Control | Concrete | View |
2025-05-07-44 | 05/07/2025 | 05/07/2025 | Quality Control | Concrete | View |
2025-05-06-49 | 05/06/2025 | 05/06/2025 | Quality Control | Concrete | View |
2025-05-05-53 | 05/05/2025 | 05/05/2025 | Quality Control | Concrete | View |
2025-05-02-38 | 05/02/2025 | 05/02/2025 | Quality Control | Concrete | View |
2025-05-01-6 | 05/01/2025 | 05/01/2025 | Quality Control | Concrete | View |
2025-04-30-8 | 04/30/2025 | 04/30/2025 | Quality Control | Concrete | View |
2025-04-29-21 | 04/29/2025 | 04/29/2025 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods