Project Details
This page displays current information for project DEA: 043W5204.
Project Information
Project Identifiers | Project ID: 995445 DEA: 043W5204 EFIS: 0421000384 |
---|---|
DIST-CO-RTE-PM | 04-ALA-580,680,880-VAR |
Award Date | 01/24/2024 |
Closeout Date | Not set |
Work Description | PLACE POLYESTER CONCRETE OVERLAY AND REPLACE JOINT SEAL. |
Location Description | ALAMEDA COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 11/16/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
eddie.dike@dot.ca.gov | Eddie Dike | Resident Engineer | Caltrans RE DB |
dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 11 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-09-26-59 | 09/26/2024 | 09/27/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-09-25-79 | 09/25/2024 | 09/26/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-09-25-77 | 09/25/2024 | 09/26/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-09-24-92 | 09/24/2024 | 09/26/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-09-26-43 | 09/26/2024 | 09/27/2024 | Quality Assurance | Aggregate | View |
2024-09-25-61 | 09/25/2024 | 09/26/2024 | Quality Assurance | Aggregate | View |
2024-09-24-72 | 09/24/2024 | 09/25/2024 | Quality Assurance | Aggregate | View |
2024-07-19-34 | 07/19/2024 | 07/23/2024 | Quality Control | Polyester | View |
2024-07-17-60 | 07/17/2024 | 07/19/2024 | Quality Control | Polyester | View |
2024-07-09-100 | 07/09/2024 | 07/10/2024 | Quality Control | Polyester | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods