Project Details
This page displays current information for project DEA: 043Y1604.
Project Information
Project Identifiers | Project ID: 995362 DEA: 043Y1604 EFIS: 0423000203 |
---|---|
DIST-CO-RTE-PM | 04-SON-128-15.98/16.55 |
Award Date | 01/18/2023 |
Closeout Date | Not set |
Work Description | Repair slope embankment damage to roadway due to slide, restore drainage function, and install rock slope protection, soldier pile, and rock stabilization (DTWM - Anchored) to stabilize adjacent slope. Construct 120 foot long segmented soldier pile wall with pile cap. Max height of the wall is 7 fee |
Location Description | Not set |
QA Service Level | 1 (Verified on 04/12/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
harley.paulo@dot.ca.gov | Harley Paulo | Resident Engineer | Caltrans RE DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods