Project Details
This page displays current information for project DEA: 072XF604.
Project Information
Project Identifiers | Project ID: 995361 DEA: 072XF604 EFIS: 0723000126 |
---|---|
DIST-CO-RTE-PM | 07-VEN-33-24.25/27.3 |
Award Date | 03/01/2023 |
Closeout Date | Not set |
Work Description | Rebuild the eroded side slopes, rebuild the damaged shoulders, reconstruct the dike, repair the sinkhole on the shoulder, repair the eroded areas next to EP, behind guardrail, and around the flumes, reinstall guardrail, rebuild RSP, clean the drainage systems, construct a SPW |
Location Description | Not set |
QA Service Level | 1 (Verified on 11/27/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 15 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-12-13-8 | 12/13/2023 | 12/13/2023 | Department Acceptance | Aggregate | View |
2024-01-31-28 | 01/31/2024 | 01/31/2024 | Department Acceptance | Aggregate | View |
2023-11-27-4 | 11/27/2023 | 11/27/2023 | Department Acceptance | Soil | View |
2023-10-17-77 | 10/17/2023 | 10/17/2023 | Department Acceptance | Soil | View |
2023-12-01-8 | 12/01/2023 | 12/01/2023 | Department Acceptance | Soil | View |
2023-12-01-9 | 12/01/2023 | 12/01/2023 | Department Acceptance | Soil | View |
2024-05-24-26 | 05/24/2024 | 05/24/2024 | Acceptance | Soil | View |
2024-06-12-68 | 06/12/2024 | 06/12/2024 | Acceptance | Soil | View |
2024-06-25-10 | 06/25/2024 | 06/25/2024 | Acceptance | Soil | View |
2024-08-07-49 | 08/07/2024 | 08/07/2024 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods