Project Details
This page displays current information for project DEA: 051Q8104.
Project Information
Project Identifiers | Project ID: 995350 DEA: 051Q8104 EFIS: 0523000076 |
---|---|
DIST-CO-RTE-PM | 05-MON/MON-25-1.13/1.13, VAR/VAR |
Award Date | 01/13/2023 |
Closeout Date | 11/25/2024 |
Work Description | Culvert replacement, slurry backfill, install HDPE slip liner, annular space grouting. Reset culvert inlets. Clear sediment debris from inlets. Repair and install downdrains. Repair asphalt around downdrain inlets. Regrade embankments. Rebuild embankments, shoulders and structural sections. Regrade |
Location Description | Not set |
QA Service Level | 1 (Verified on 10/10/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
adam.rianda@dot.ca.gov | Adam Rianda | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods